My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Demolition Plan <br />Courthouse Sauare <br />Salem, OR <br />This plan covers demolition activities for the above referenced project. <br />All hazardous materials will be removed prior to demolition. <br />The demolition is organized into three phases: <br />PHASEI <br />• A site specific safety plan [x] has [] has not, been prepared for this <br />project. <br />• All employees will attend a daily safety tailgate meeting. Activities, <br />hazards and accident prevention will be discussed. <br />• All utilities will be disconnected or removed prior to demolition. <br />• Building will be systematically disassembled and torn down utilizing heavy <br />equipment to minimize employee contact. <br />• Demolition material will be source separated on site for recycling or <br />disposal. <br />PHASE II <br />• All demolition material will be processed down to manageable sizes. <br />• Regulated demolition material will be loaded on to trucks for <br />transportation to a recycling facility or a licensed landfill. <br />PHASE III <br />• Concrete demolition material will be processed down for recycling or <br />disposed of in an approved, legal manner as fill material. <br />• Voids and depressions will be filled or smoothed. <br />• Utilities will be capped according to local authorities. <br />I certify that I have inspected the above referenced structure and find that it <br />is structurally sound for selective mechanical demolition activities. <br />.' 2 <br />Ron Richey Date <br />General Mgr. <br />Staton Const. <br />demoplan <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.