My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 00400 <br />AgreemendContract <br />Page 3 of 3 <br />~ Item 22. The contractor shall pay a fee equal to one-tenth of one percent (.1 percent) of the <br />contract to the Bureau of Labor and Industries. Due on or before the first progress <br />payment or 60 days form the date work first began on the contract, whichever <br />comes first. $518.57 <br />~ Item 24.1 Recoverv and Waste Management Plan <br />~ a. Types of waste materials produced as a result of work performed... <br />. b. Estimate quantities of waste produced , <br />^ c. Identification of materials with the potential to be recycled, reused or <br />salvaged <br />^ d. On-site storage and separation requirements <br />^ e. Transportation methods <br />^ f. Destinations for materials <br />^ g. Method for tracking and accounting of materials for meeting 90 percent <br />recycling goal <br />~ h. Estimated amount paid to Contractor for each material recovered <br />~ I. Estimated cost to get materials to the market <br />CONTRACTOR STATES PRICES CANNOT BE GIVENAT THIS TIME <br />~ j. Estimated cost of transportation and disposal for unrecovered materials <br />CONTRACTOR STATES PRICES ARE STII.L BEING NEGOTIATED AND NOT <br />AVAII.ABLE AT THIS TIME <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.