My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 26, 1999 <br />Glen Cook, P.E. <br />Executive Vice President <br />Century West Engineering Corporation <br />549 SW Mill View Way <br />Bend, Oregon 97702 <br />RE: Contract for Structural Engineering Services <br />Courthouse Square, Salem, Oregon <br />Project No. 9828 <br />Dear Glen: <br />On June 30,1999, we were verbally informed by Tim Terich that he and Jason Dhanens were leaving Century <br />West Engineering Corporation to commence comparable positions with Tim R. Froelich Consulting Engineers, <br />Inc. Tim indicated in conversation that this change would be transparent to us since he would continue to <br />service the project as an employee of Century West E~gineering Corporation. <br />This change is a matter of significant concem to us. In January we were informed of the departure of Mike <br />Hayford as the Structural Engineer of Record. Tim Terich as a replacement of Mike Hayford was acceptable <br />to us since Tim had been involved with the project from the beginning, and he assu~ed us that when ~eeded, <br />we could get intermittent access to Mike Hayford through Century West. With the departure of Tim Terich and <br />Jason Dhanens, we understand that Century West no longer maintains a full-time structural engineering <br />department. <br />Si~ce the Construction Review/Contract Administration portion of your agreement for service on this project <br />is now only partially complete, we would appreciate a letter indicating arrangements made with Tim Terich <br />which will ensure that structural engineering representation for const~uction review will continue seamlessly, <br />for the duration of the project. <br />Sincerely, <br />Leonard Lodder, A.I.A. <br />Architect <br />LL:gnv <br />cc: Craig Lewis, Melvin Mark Development Company <br />Billy Wasson, Marion County <br />John Whittington, Salem Area Mass Transit <br />Tim Terich, Century West Engineering <br />9828.1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.