My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Subs
>
CS_Courthouse Square
>
Arbuckle Subs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:47:31 AM
Creation date
8/2/2011 11:25:04 AM
Metadata
Fields
Template:
Building
RecordID
10065
Title
Arbuckle Subs
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Leonard Lodder From: Architectural Cost Cfasuftants. LL<Oate: 7/Y8/98 Time: 11:0624 <br />f <br />. • <br />Architectural Cost Consultants, LLC <br />Page 1 oi 2 <br />James A Jerde, AIA <br />Stanley J. Pszczollcowski, AIA <br />6441 SW Canyon Couit, Suite 103 <br />_ __ ._,., Portland, Oregon 97221-4158 <br />Voice: (503) 297-7210 <br />r F~_ (503) 297-7187 <br />July 27, 1998 <br />Mr. Leonard Lodder, AIA <br />Arbuckle Costic Architects, INC. <br />363 State Street <br />Salem, OR 973C11-3533 <br />Subjed: Courthouse Square <br />Extended Basic Servicas Fee Proposal <br />D~ar Leonard: <br />Our proposed fees Eor e~.~tended estimating servioes (to further document the di~~ision of costs into specific categories <br />{a trans~t, county, etc., based on the meeting of July 16, 1998 )~till be: <br />Item Iabor Hours Hourly Rate Subtotal Totals <br />DesignDevelapmentFstimatc Principal <br />Technical 8 <br />16 }us. <br />1us. $86.00 <br />S43.OC~ 688 <br />688 $1,376.00 <br />DD Mechanical / Electrical Principal <br />T~}~~ S <br />12 }us. <br />tus, $86.00 <br />$43.00 688 <br />516 ~ 51,204.00 <br />~uction Documenu principal 4 fus. 586.00 344 $688.00 <br /> Technical 8 fus. ' $43.00 344 <br />'CD Mechanical / Etectrical Prineipal 4 hcs. 586.00 344 $688.00 <br /> Technical 8 }us. $43.00 344 <br />Bid Reconciliation Principai 12 hrs. 586.00 1,032 $1,032.00 <br />Total Lump Sum Fee 80 hrs. ~+~'~ <br />We will pcovide detailed quantity talce-of~'s based on defined areas (as detumined and documented by architect and <br />users~ Dociunented plans and agreed to percentag'es to be supplied to ACC prior to stacting the DesiBn Development <br />estimate. <br />All 'reimbwsable" expenses, associated with vrork within the Portland Metro area, including travel, parking, <br />telephone and postage are included in the above fees. Any travel outside the Portland Metro area will be billed at oost <br />phfs 10%, subject to prior approval. <br />Additional se~vices beyond the scope of the work defined above, including value engineering worlcshops wiil be billed <br />at an howly ~ate. Principals will be billed at $86.00 per hour and technical labor at $43.0~ per hour. <br />Sincerel~~, <br />Stanlev J. Pszczolko~s~ski, AIA <br />
The URL can be used to link to this page
Your browser does not support the video tag.