My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Subs
>
CS_Courthouse Square
>
Arbuckle Subs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:47:31 AM
Creation date
8/2/2011 11:25:04 AM
Metadata
Fields
Template:
Building
RecordID
10065
Title
Arbuckle Subs
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Kim Arbuckle, fVA <br />Alan E. Costic, AfA <br />Walter E. Bensman, Jr., AIA <br />Clayton Vorse, AIA <br />Mark M. Foster, AIA <br />Leonard Lodder, AW <br />Richard S. Rothweiler, AIA <br />July 28, 1998 <br />Billy Wasson <br />Project Co-CoorcfinatoNDiredor of Comedions <br />Marion County <br />4040 Aumsville Highway SE <br />Salem, Oregon 97302 <br />RE: Acoustical Consultant Se~vices <br />Relationship of Buses to Office Building <br />Courthouse Square <br />Project No. 9828 <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, OR 97301-3533 <br />503/581-4114 Fax: 503/581-3655 <br />E-Mail: acarchQopen.org ~ E~ E 1 V E D <br />~UI. 3 1 1998 <br />~w,~io~ coururY ceQ~ECTioNs <br />WORK CENTEk <br />Dear Billy: <br />As agreed in a previous developmerrt team meeting, we received a proposai from an acousticat consuitarrt <br />as arranged by Craig Lewis of Meivin Mar1c Developmerrt. Attached herein is a copy of their proposal for <br />basic se~vices to measure existing sound levels and to provide rec~ommendation to mitigate the transfer of <br />bus operations noise from the bus transfer mall to the interior of the building. As indicated in their `scope <br />of w~ic," they arrticipate involveme~t during the construc~ion document phase as well as during construdion. <br />Should they be asked to expand on their terms of reference during the course of the work~ a schedule of <br />rates has been included. <br />Arbuckle Costic Architeds will invoice the actual cost of invoices received from Altennatt Assoaates plus <br />ten percent to cove~ the ovefiead. If this arrangemerrt is acxeptable, please sign below and retum one copy <br />for our files. <br />If you have any questions, please do not hesitate to call. <br />Sincere , <br />~,~ <br />~rl <br />eo Lodder, AIA ~ ~ <br />Archited <br />LL:mh • <br />Encl. <br />cc: Craig Lewis, Melvin Marks:~evelopment <br />John Whittington, Salem Area Mass Transit <br />9828.1 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.