My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interim Architect Agreement/Contract
>
CS_Courthouse Square
>
Interim Architect Agreement/Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:47:23 AM
Creation date
8/2/2011 11:15:47 AM
Metadata
Fields
Template:
Building
RecordID
10061
Title
Interim Architect Agreement/Contract
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3140 Del Webb Avenue NE <br />Salem, OR 97303-4165 <br />503-588-2424 Fax 588-0209 <br />E-mail: cherriots.org <br />May 8, 1998 <br />Pat Hend x <br />Federal r sit Administration <br />U. S. De ment of Transportation <br />Federal uilding, Suite 3142 <br />915 c nd Ave. <br />S tle. 98174 <br />Dear Pat, <br />~E~EIVED <br />f.~AY 1 ~ i498, <br />MARION COUNTY CORRECTIONS <br />WORK CENTER <br />C~keY~~ots <br />** Sent by FAX and Mail ** <br />We are "taking you up" on your offer to initiate the review of the architect's contract for <br />Courthouse Square. Enclosed you will find a recent addendum to the interim agreement, <br />which, together with the previously-executed interim agreement, the AIA contract for <br />services, supplemental provisions to the AIA contract, and Federal conditions, comprises <br />the architecturaUengineering services package. <br />Ben Fetherston's letter of Apri122, 1998, to Shelly Brown, contained an earlier draft of <br />the addendum, as well as the other contract documents. The only changes that have been <br />made since that mailing are in the addendum. You were copied with the Apri1221etter <br />and enclosures, so I'm now sending on to you the final version of the addendum (replacing <br />the previous version) to add to the rest of the contract documents. For the sake of clarity, <br />we understand the contract documents to include the interim agreement, the addendum to <br />the interim agreement, the AIA contract, the supplemental provisions to the AIA contract, <br />and the FTA contract requirements addendum. While this "package" approach to the A&E <br />contract is perhaps a bit unwieldy, we thought it was the best way to retain the history of <br />the contracting process that has taken place with the architectural consultant. <br />As you'll note in the addendum, the architect has given us credit for a portion of the work <br />that was completed on the "old design." The amount shown in the addendum, $180,421 -- <br />a portion of the $434,881 that was expended by the County and the District on the old <br />design -- is considered to represent work wtuch is applicable to the redesign of the project, <br />and thus is credited within the 6% fee that the architect is eaming on the project. We <br />assume that this sum will be eligible for FTA funding, as it is original work which pertains <br />directly to the design and engineering of the current project. <br />The $180,421 credit for previous work is a substantially larger sum than had been initially <br />proposed by the architect. In reviewing the work that had been accomplished up through <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.