My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Request - Arbuckle
>
CS_Courthouse Square
>
Change Order Request - Arbuckle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:11:20 PM
Creation date
8/2/2011 10:45:45 AM
Metadata
Fields
Template:
Building
RecordID
10377
Title
Change Order Request - Arbuckle
Company
Arbuckle/Costic
BLDG Date
10/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEC-23-99 THU 16;09 <br />~ <br />COMPANY <br />(:U t1 31 <br />ARBUCKLE COSTIC ARCN INC FAX N0, 5035813655 <br />CI~[ANGE ORDE~t ANALYSIS <br />Summ~ry Sheet <br />Inxtul! Pn~;in~ Spcakc~+ DA'I'~: <br />A, TUTAL PRtCF. TH~S CHANGF ORDER <br />as shown in ilem l5; <br />B, Scope lo be performed: <br />1, 5ee attac:hed documents <br />P, 05/10 <br />EC Proposal # : ECCR-A31 <br />nwner's Ref. #: ~toposal Request 4C> <br />C. Cost Summary; <br />l. ~'otal Material Cos~ {see b~l~-up) <br />2. Tot~l Burdened Labor Cost (see back-up) <br />3, Subcontracton Cost (see back-up) <br />4. ~qui~nnent Cost (seE back-up} <br />S. Other Miscellazxeous Costs (sce back-up) <br />6. Small Tooi alIow 0 % of item 2 <br />~ <br />7. Record Drawings and 5ubmit~als <br />8- 'Warraniy Work 0.00 % of direct expcns~s <br />9, Overi~e~d 10 % <br />I0. ~ROFIT ~t 0 % <br />I 1. B~O Tar % VV'A only . <br />12. S~les TaY 0.00 % <br />13. Aond 0.00 % <br />TOTAL PRICF THIS CHA.NGE ORDER <br />$ <br />$ <br />$ <br />46, 549.00 <br />40,450.00 <br />1,867.04 <br />0.00 <br />0.00 <br />0.00 <br />4,231.70 <br />0.00 <br />46,54.8.74 <br />This ch~nge order requires a schedule adjustment of 0 days. Pricing subjec# to <br />revision after 30 days. <br />The costs represertted inClude only thost clearly identified at this time. Na impact ar delay tosts are <br />Ineluded. Should it be determined at a latet date that the project is impacted by muitipie scope <br />changes, or causes beyond our con#rel, those costs may be submitted at that time, Work wili commence <br />upon written acceptance by an authorized agent, . <br />E C Cornpany Authorized Agen# <br />Craig pa~is PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.