Laserfiche WebLink
C~~ANGE ORDER ANA,LYSIS <br />Summxry shcet <br />PR-36 Item,s I.Z, S~4 DA~: 10l18/99 <br />~..~ <br />COMPANY " <br />CO # ~9 EC Proposal # : ECCR-Q29 <br />Ownez's Ref. #: PR-36 Xtems 1,2 & 4 <br />A. TOTAL PRiCE THIS C~-IANG~ ORDER <br />as shown in item 15; $ 64;791,00 <br />B. Scope to be performed; <br />i, See attached decuments <br />C. Cost Summary: <br />~. Tota1 Material Cost (see back-up) $ 38,666.00 <br />2. Total Burderaed Labor Cost {see back-up) 20,235.00 <br />3. Subco~tractors Cost (see batk-up) 4.00 <br />4. Fquipment Cost (see bac~C-up) 0.00 <br />5. Other Miscellaneous Costs (see back-up) 0.00 <br />6. Smatl Toal a11ow 0 % of iter~a 2 <br />7. Record Aratt+ings an.d Submitt~is <br />8. Warranty Work QOQ % oF dxtect expez~ses <br />9. Overhead 10 % 5,890.10 <br />] 0. PROFIT at 0 % <br />I 1. B&O Tax % WA only <br />12. Sales Tax 0,00 % <br />~3. Bond O.oo % 0.40 <br /> TOTAL PR~CE THIS CHANGE ORDER $ 64,79~.10 <br />This change order requires a schedule adjustment of 0 days, Pricing subject to <br />revision after 3Q days. <br />7he costs represented include only those clearly identified at this time, No impact or deiay cost5 are <br />included. Should it be determined at a later date that the project is impacted by multiple scape <br />changes, or causes beyond our co~trol, thase costs may be submitted at that time. Work wlll Commence <br />upo~ written acceptance by an authorized a~ent. <br />E C Company <br />Ceaig pavis PM <br />Autharized Agent <br />£Z/90 'd 559£ t 89£05 'ON X~~ ~N I H~~b ~ I.LSO~ ~1~I~flB~d 8Z ~~ i~fl,L 66-9Z-,L~ <br />