Laserfiche WebLink
DEC-~3-99 THU 16~09 <br />CQMPANY <br />(:U ff 31 <br />FAX N0, 5035813655 <br />CIIANGE ORDER ANALYSIS <br />Summary Shect <br />InKt~[I Pri~;in~G Spcakera <br />A, TUTAL PR[C,F Ti-~~S CHANGF ORDER <br />as shown in item l5; <br />B. Scope to be perCormed: <br />1, See attac:hed docurnenis <br />DA"T~: <br />P. 05/10 <br />EC Proposal # : ECCR-031 <br />nwner's Ref. #: Pro osal Re uest 4G <br />$ <br />C. Cost Summary: <br />l. To~al Material Cost (see ba~I~-up) <br />2. Tot~l Burdened Labor Cost (see back-up) <br />3, Subcontractors Cost (see back-up) <br />4. ~qui~rnent Cost (seE back-up) <br />S. Other Miscellaz~eous Costs (sce back-up) <br />6. Small Toai alIow 0 % of item 2 <br />7. ~tecord Drar~rin~s and Submittals <br />8. 'VVarranfiy Work 0.00 % of direct expensEs <br />9, Overhe~d ~p % <br />10. PROFIT at p % <br />i 1, B~O Ta~c % WA only <br />12. Sa,les Tati 0.00 % <br />13, Aond 0.00 % <br />TOTAL PRTCE THIS CHANGE ORbER <br />$ <br />$ <br />46, 549.00 <br />40,450.00 <br />1,867.04 <br />0.00 <br />o.ao <br />0.00 <br />4,23I.70 <br />0.00 <br />46, 548.74 <br />This ch~nge order requires a schedute adjustment of 0 days. Pricing subject to <br />revision after 30 days. <br />The costs represented include o~ly those c(early identified at this time. No impact or delay casts are <br />included. Should it be determined at a later date that the projec# is impacted by multipie scope <br />changes, or causes beyond our con#rol, those costs may be submitted at that time. Work wili commence <br />upon written acceptance by an autharized ~geni. <br />E C Company <br />Craig pavis PM <br />ARBUCKLE COSTIC ARCH INC <br />Authorized Agertt <br />