My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Request - Arbuckle
>
CS_Courthouse Square
>
Change Order Request - Arbuckle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:11:20 PM
Creation date
8/2/2011 10:45:45 AM
Metadata
Fields
Template:
Building
RecordID
10377
Title
Change Order Request - Arbuckle
Company
Arbuckle/Costic
BLDG Date
10/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ NOV-24-99 WED 17~04 ARBUCKLE COSTIC ARCH INC FAX N0, 5035813655 <br />(1) Securitron BPS-24-3 operatianal back-up power system (elevator control) <br />P, 10/10 <br />(1) S~curi#ron 6PS-12-1 operationa! power system tfor long-range parking reader) <br />(5} Hoffman NEMA 1 equipment enclosures <br />(lot) Labor to terminate and re-instal! electrit lock devices (provided by others) <br />{Iot) Low voltage and communications nefwork <br />(lot) Labor and materials to install, test, train and warrant the system <br />Tota1 System investment @ $ 84,8fi9. <br />B. Clarificatio~s ~ Co~siderations <br />System power. 120VAC power {at 6(ocations} and conduit ar~ not inc~uded in <br />this proposal. <br />2. Cable Network; Shauld Electrica! Canstruction Co. choose to pull the low <br />voitag~ and communicatians cable provided by Seiectron, deduct $ 5,425. from <br />the total syst~m investment. <br />3. Building lnterconnections. (1} Cat 5 LAN cable and (1) 22/2 twisted, shielded <br />communications cabfe is required from the Facili#y Office ~n the existing <br />cour#house #o the location of the~new warkstation in Courthouse Square. This <br />cabfe run is not included in this praposaf. <br />4. Scheduling. Please allow approximately four to six weeks for equipment <br />delivery. It would b~ prudent to aflow an additional two weeks for scheduling, <br />four weeks for installation and two weeks for system test, programming and <br />tralning. <br />5. Terrns. i'rices are valid for 30 da~ys from date of ~roposal. Freight is f.o.b., <br />jobsite. Terms are net 30, progressive. Equipment r~ceived and labor <br />performed wifl be invoiced on the 25~' of each month, with a 5% set-a-side <br />pending system completion. <br />Craig, should you have any questions or desire further information, please contact me. <br />1 am Eager to be of assistance whenever possibte. <br />Cordia(ly, <br />~ <br />Larry Marb t <br />
The URL can be used to link to this page
Your browser does not support the video tag.