Laserfiche WebLink
CI~IANGE ORDER ANALXSIS <br />Summalry Shec! <br />Acld cunduit, ffl~cr cable, t~lco cablc DA'~';~; ~p/;g/~g <br />~~ <br />COMPANY ` <br />CO # Z9 EC Proposal #: ECCR-029 ~ten~ 4 <br />Ownez's Ref. #; PR-35 <br />A. TOTAL PR1CE 1'HiS C~iANGE OTtDER "` <br />as shown in it,em 15; $ 22,27~.00 <br />B. Scope to be ~erfarmed: <br />I. ~See attached documents <br />C. Cosl Surr~mary; <br />1. Total 1V~ateria~ Cost (see back-uP) $ 1~,,592.00 <br />Z. Total Burden,ed Labor Cost (see bac~C-up} 8 654.40 <br />~ <br />~. Subcontractors Cost (see back-up) 0.00 <br />4. Equ~pment Cost (see back-up) 0.00 <br />5. OthCr Miscellaneous Costs (see back~up) 0.00 <br />6. Small Tool a~low 0 % of item 2 <br />7. Record Dra.wings and Submittals <br />8. Warranty Work 0.(}0 % of direct expenses <br />9. Overl~,ead 1Q v/o 2,024:64 <br />10. ~ROF1T at 0 % <br />~ 1. B&0 Tax % WA ot~ly <br />I2. Sa1es Tai U.00 % <br />~3, Bon~d p.ao % 0.00 <br /> TQTAi, PRYCE TE~I'S CHANGE ORDER ~ 22,271.04 <br />~This change order r~quires a schedufe adjustrnent of 0 days. Pricing subjec# to <br />Irevision after 30 days. <br />7he costs represented include only those c4early identified at this time. No itnpact or delay costs are <br />included. Should it be determined at a later date that the project is impacted by muftiple scope <br />changes, or causes beyond our control, those costs may be submitted at thdt time. Work wil) comrnence <br />upon written ar.ceptance by an authoriaed agent. <br />E C Company <br />Craig Davis PM <br />Authorized Agent <br />£Z/6i 'd 959£i85£05 'ON X~.~ ~NI H~~d ~I1S0~ ~~iX~f18~d 9£,~i ~f1,L 66-9Z-1~0 <br />