My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Request - Arbuckle
>
CS_Courthouse Square
>
Change Order Request - Arbuckle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:11:20 PM
Creation date
8/2/2011 10:45:45 AM
Metadata
Fields
Template:
Building
RecordID
10377
Title
Change Order Request - Arbuckle
Company
Arbuckle/Costic
BLDG Date
10/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER ANALYSIS <br />Summary Shcet <br />Add conduit, fibcr cablc, tcIco cublc DATE: 10/18/99 <br />~~ NY ~ <br />CO # Z9 EC Proposal #;~CCR-029 Item 3 <br />Owner's Ref. #: PR-35 Alternate B <br />A. T4T~lL ~ItICE THIS C~ANGfi ORf)ER <br />as sho~vn in item 15; $ 12~695.00 <br />B, Scope to be ~erformed: <br />1. See attach~ed documents <br />C. Cost Swmimary: <br />1. Total Materia~ Cost (see bacic-up) $ 5,940.~0 <br />2. Total ~uxdened Labor Cast (see back-up) 5,601.12 <br />3, Subcoritractoxs Cost (see back-up) , 0.00 <br />4. Equipment Cost (see back-ug) 0,40 <br />5. Other Miscellaneous Costs (see back-up} 0.00 <br />6. SmalI Tool allow 0 % of itctn 2 <br />7. Record Drawin~gs and SubmittaIs <br />$. 'UV'ar~anty Work 0.00 % of direct expenses <br />9, Overhead 10 % 1,154.11 <br />10. PRO~'1T at 0 % <br />i l. B&O Taa: ~% WA only <br />12. Sales ~'2x 0.00 % <br />~3. Bond o.00 % O.QO <br /> TOT,A,L PRICE Tf~S CHANGE ORDER $ 1,2, 695.23 <br />This change order requires a schedule adjustment of 0 days. Pricing subject to <br />revision after 30 days. <br />The costs represented include only those clearly ide~tified at this time. No impact or delay costs are <br />included. Should it be determined at a iater date that the project is impacted by muitiple scope <br />changes, or causes beyand our control, those costs may be submitted at that time, Work wili commence <br />upon written acceptance by an authorized agent. <br />~ C Company <br />Craig Davis PM <br />Authorized Agent <br />£Z/9i 'd 559£i89£09 'ON Xd~ ~NI H~~~ ~I1S0~ ~~fX~(18~d ti£,~j ~f11 66-9Z-~.~0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.