Laserfiche WebLink
CHANGE ORDER ANALYSIS <br />Summary Shcet <br />Add conduit, fibcr cablc, tcIco cublc DATE: 10/18/99 <br />~~ NY ~ <br />CO # Z9 EC Proposal #;~CCR-029 Item 3 <br />Owner's Ref. #: PR-35 Alternate B <br />A. T4T~lL ~ItICE THIS C~ANGfi ORf)ER <br />as sho~vn in item 15; $ 12~695.00 <br />B, Scope to be ~erformed: <br />1. See attach~ed documents <br />C. Cost Swmimary: <br />1. Total Materia~ Cost (see bacic-up) $ 5,940.~0 <br />2. Total ~uxdened Labor Cast (see back-up) 5,601.12 <br />3, Subcoritractoxs Cost (see back-up) , 0.00 <br />4. Equipment Cost (see back-ug) 0,40 <br />5. Other Miscellaneous Costs (see back-up} 0.00 <br />6. SmalI Tool allow 0 % of itctn 2 <br />7. Record Drawin~gs and SubmittaIs <br />$. 'UV'ar~anty Work 0.00 % of direct expenses <br />9, Overhead 10 % 1,154.11 <br />10. PRO~'1T at 0 % <br />i l. B&O Taa: ~% WA only <br />12. Sales ~'2x 0.00 % <br />~3. Bond o.00 % O.QO <br /> TOT,A,L PRICE Tf~S CHANGE ORDER $ 1,2, 695.23 <br />This change order requires a schedule adjustment of 0 days. Pricing subject to <br />revision after 30 days. <br />The costs represented include only those clearly ide~tified at this time. No impact or delay costs are <br />included. Should it be determined at a iater date that the project is impacted by muitiple scope <br />changes, or causes beyand our control, those costs may be submitted at that time, Work wili commence <br />upon written acceptance by an authorized agent. <br />~ C Company <br />Craig Davis PM <br />Authorized Agent <br />£Z/9i 'd 559£i89£09 'ON Xd~ ~NI H~~~ ~I1S0~ ~~fX~(18~d ti£,~j ~f11 66-9Z-~.~0 <br />