Laserfiche WebLink
04/19/2000 12:26 FAX 503 581 ~655 ARBUCKLE COSTIC ~ 005/011 <br />~ CHANGE ORDER ANALYSIS <br />5ummary Slicet <br />AdJitiunal fihcr-upfic cahl~ run~ nn~rr; ua~~ a~~r~ <br />COMPANY Al:l"~I~NnTr ~ ~ <br />CO # 6I EC Proposa] #: C27~9-G] <br />' Owner's ReC #: PR-92 <br />A T07'AL PRICE THIS CHANGE ORDER <br />as sho«fi in item 1~: $ 5,63I.00 <br />B. Scope to be pertonned; <br />1, See ariached docaments <br />C. Cost Summan7: <br />1. 1"ola] Material Cost (see back-up) $ 3,999.00 <br />2. Toial Burdened Labor Cost (see back-up) 1,120.00 <br />3. Subcontractors Cost {see back-up) O.QO <br />~. F_quipment Cost (see back-up) 0.00 <br />5. Other Miscellaneous Costs (see back-up) 0.00 <br />6. Sma]l Tool allow 0 % of item 2 <br />7. Record Dran7ngs and SubmittaZs <br />8. Wazranty Work o.oo % of direct ~pa,sc~ <br />9. Overhead 10 % " 511.90 <br />10_ FROFIT at - 0 % <br />1 I. B&O Tax, % WA only <br />I2. Sales ~'aa: 0.00 % <br />13. $o1Cld 0.00 % 0.00 <br />TOTAL PRICE THI5 CHANGE ORDER $ 5,630.90 <br />This change order requires a schedule adjustment of 0 days. Pricing subject to <br />revision after 30 days. <br />The costs repiesented include only those clearly identified at this time, No impact or delay costs are <br />included. Should it be determined at a later date that the project is impacted by multiple scope <br />changes, or causes beyond our control, those cos2s may be submitted at that timE. Work will commence <br />upon written acceptance by an authorized agent, <br />E C Company ~ <br />Craig Davis PM <br />Authorized Agent <br />