My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Request - Arbuckle
>
CS_Courthouse Square
>
Change Order Request - Arbuckle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:11:20 PM
Creation date
8/2/2011 10:45:45 AM
Metadata
Fields
Template:
Building
RecordID
10377
Title
Change Order Request - Arbuckle
Company
Arbuckle/Costic
BLDG Date
10/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE O~tDE~t ANA-LYSYS <br />SummAry Sh..r+t <br />lnstall conduit, fibcr cablc, telco cable. DA'TL: <br />~~~_ <br />COMPANY ' <br />CO # 29 EC Pxoposal #: ECCR-029 Itern~ i <br />Owner's Ref. #: PR-36 Iterr~ 1 <br />A. TOTAL PRICE THIS CHANGE ORDER <br />as shown in item, 1. S; $ 21, 510.OQ <br />B. Scope to be perfarmed: <br />1. See attached documents <br />C. Cost Sutnma~y: <br />I. Total Mat,erial Cost (see back-up) $ 13,574.00 <br />2. Tota! Burdczzed Labor Cosi (see back-up) 5,980.20 <br />3. Subcontractors Cost {see back-up) 0.00 <br />4. Eqwipment Cost (see bacic-up) 0.00 <br />5. Other Miscellaneous Costs (see bac~-up) p.00 <br />6. Small Toot allow 0 % of itc~n 2 <br />7, Record Drawings and Submitials <br />S. Warranty 'VVork 0.04 % of direct e~penses <br />9. Overhead 10 % 1,955.42 <br />10. PROFIT at 0 % <br />11. Bd~O Tax % WA only <br />12. SaIes Tax o.00 % <br />13. Bond o.oo % 0,00 <br /> TOTAL ~RICE T~IIS CfiANGE ORDER $ 2~,509.62 <br />This change order requlres ~ schedule adjustment of Q days. Pricing subject to <br />revision after 30 days. <br />The costs rep~esented include only those clearly identified at this time. No impact or delay costs are <br />incfuded. Should it be determined at a later date that the proj~ct is impacted by multiple scope <br />changes, or causes beyond our control, those costs may be submitted at that time, Work will commence <br />upon written acceptance by an authorized agent. <br />E C Company <br />C~aig Davjs PM <br />Authorized Agent <br />£Z/LO'd 559£i89£09 'ON X~~ ~NI H~b~ ~I,LSO~ ~~IX~f18~~ 6Z:tit ~ni ss-sz-i~o <br />
The URL can be used to link to this page
Your browser does not support the video tag.