My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Request - Arbuckle
>
CS_Courthouse Square
>
Change Order Request - Arbuckle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:11:20 PM
Creation date
8/2/2011 10:45:45 AM
Metadata
Fields
Template:
Building
RecordID
10377
Title
Change Order Request - Arbuckle
Company
Arbuckle/Costic
BLDG Date
10/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORbER ANALYSIS <br />Summary Shcct <br />!'It-36 xlcros 1,3,& ~1 DAT~; 10/1 F3/99 <br />___,,.r...r_ <br />COMPANY ` <br />(;O # 29 EC ~ropos~l # : ~CCR-U29 <br />~ Owner's Ref. #: pR-36 Items ~ ~3,&4 <br />A. TOTA,L PRICE THIS CHANGE ORAER <br />as shor~i in item 15; $ 56,475A0 <br />s. Scope to be performed: <br />1. See att$ched documcr~ts <br />C. Cost Summary: <br />I. Total Materia] Cost (see back-up) $ 31,106.40 <br />2. Total Burdett,ed Labor Cost (see back-up) 20,235.00 <br />3. Subcontractors Cost (see bac~:-up) 0.00 <br />4. Equipme~nt Cost (see back-u~) 0,00 <br />~. Othec Miscellataeous Costs (see back-up) 0.00 <br />6. Smiall Tool allow a % of item 2 <br />7. Record Drawings and Submittals <br />$. Warranty Work 0.00 % a~ direct e~cpenses <br />~. Overhead 10 % 5,134.10 <br />io, PROFrr ai o °ia <br />11. B&O Tax % WA onty <br />~z. sa~~s xax a.ao ~io <br />13. Bond 0,00 % 0.00 <br /> TOTAL, ~RICE ?HTS CHANGE O~tDER $ 56,475.10 <br />This change ordet tequires a schedule adjustment of 0 , days. Pricing subject to <br />revision after 30 days. <br />IThC costs represented inefude only these clearly identified at this time. No impact or delay costs are <br />I included. Shou(d it be determined at a later date that the project is impacted by multiple scope <br />changes, or causes beyond our control, those costs may be submitted at thdt time. Work wi(I commence <br />;upon written acceptance by an authorized agent, <br />E C Company <br />Craig ~avis PM <br />Authorized Agent <br />£Z/90'd 559£t89£09 'ON X~~ ~NI H~~~ ~I,LSO~ ~1~I~flB~d 6z,bi ~fl,L 66-9Z-1~0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.