My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts/Amendments
>
CS_Courthouse Square
>
Contracts/Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:45:11 AM
Creation date
8/1/2011 4:59:01 PM
Metadata
Fields
Template:
Building
RecordID
10059
Title
Contracts/Amendments
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~. <br />;. <br />Novembe~ 24, 1998 <br />Revised: June 24, 1999 <br />Billy Wasson <br />Project CaCoorclinator/Director of CoRections <br />Marion County <br />4040 Aumsville Highway SE <br />Salem, Oregon 97302 <br />RE: interior Design Services <br />Solid Waste Department <br />Courthouse Square <br />Projed No. 9828 <br />Dear Billy: <br />~ <br />;,~ <br />ARBUG<LE COSTIC ARCHITECTS, INC. <br />;i,~~ tii,i!r~ ~~i~~~__, <br />Per our discussions during our meeting Thursday, November 19, 1998, we are prepared to p~ovide the <br />interior design of Solid Waste spaces as an Add Altemate to the design. Since the value of services <br />provided by our interioPs staff will probably exceed the fee delta generated by the add altemate price, we <br />are proposing an houriy basis with a not-taexceed amount developed as follows: <br />Consuitation and preparation of constn~ction documents: <br />a. Interior Designer. 70 hours ~$50/hr. _$3,500. <br />b. Project Architect: 4 hours ~$70/hr. _$280. <br />2. Bidding Phase: I~cluded. <br />3. Constnaction Review and Cont~act Administration: Included. <br />Jim Sears has expressed concern that the department not be paying twice for the same service. I have <br />reviewed the documentation prepared by Harding Lawson Associates and note that it represents a resource <br />of materials with recyGed content, but does not necessarily address servicability and life cycle costs. <br />Since , ly, <br />~ <br />,.~ , ; <br />i <br />- ----. ----~ -____~ <br />-teonard odder, A.I.A. <br />Architect <br />LL:gnv <br />cc: John Whittington, Salem Area Transit <br />Craig Lewis, Melvin Mark Development Company <br />9828.1 A <br />
The URL can be used to link to this page
Your browser does not support the video tag.