Laserfiche WebLink
J <br />November 23, 1999 <br />. , . i...r~ . ., . <br />, ... . , , ~. . . :',~;', <br />. <,, ,. f~ .. ~ ~ .. <br />- , ~ ~~i.~~~~ <br />, <br />~ , ,, ~ <br />Billy Wasson, Courthouse Square Manager '"'" '' ~ - <br />Marion County Courthouse ARBUCKLE COSTIC ARCHITECTS, INC. <br />100 High Street NE ;~, ; `,<<,', ~ ~~~ ~ ~ ~~ '~ <br />Salem, Oregon 97301 ~ ~ ~~. ~ 'I~ " ~ ~ ' " <br />, ,~ ~? I ~.: i k,i) ',! , <br />RE: Additionai Services Required for LEED Certification. ~~ ~ ~ ~, ~ ~ , ~~~.: ~~~~ ~' ~~~ ~'~ ~~~ ~~'~ ~~ ~>~~ ~ ~ <br />Courthouse Square <br />Project No. 9828 <br />Dear Billy: <br />We are pleased to offer additional services to assist the Project Team in implementing measures which would <br />help in obtaining LEED certification for the project. The tasks required to achieve certification which are not <br />already covered in our contract for services include the following: <br />1. Energy Efficiency Level 1: Title 24 Code Compliance Assessment. <br />2. Construction Indoor Air Quality Levels 1 and 2. <br />3. Implementation of Permanent Air Monitoring Systems with V.O.C. Sensors in Return <br />Air System. <br />4. LEED Certification of Designers. <br />The fees for each of the above line items are as follows: <br />1. Energy Efficiency Level 1: <br />a. Interface Engineering: $750.00 <br />b. Architect Meetings and Coordination: 250.00 <br />i. Subtotal: $1,000.00 <br />2. Construction IAQ Levels 1 and 2: <br />a. Interface Engineering: $2,000.00 <br />b. Architect, Meetings, Coordination <br />and Documentation 500.00 <br />i. Subtotal: 2,500.00 <br />3. VOC Sensor Implementation <br />a. Intertace Engineering: $500.00 <br />b. Architect: 250.00 <br />i. Subtotal: 750.00 <br />4. LEED Design Certification: <br />a. Interface Engineering: $800.00 <br />b. Architect: 800.00 <br />i. Subtotal: 1.600.00 <br />Subtotal: $5,850.00 <br />Overhead 8 Profit (10%) 585.00 <br />Total $6,435.00 ~ <br />U~~ <br />