My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contracts/Amendments
>
CS_Courthouse Square
>
Contracts/Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 11:45:11 AM
Creation date
8/1/2011 4:59:01 PM
Metadata
Fields
Template:
Building
RecordID
10059
Title
Contracts/Amendments
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Contracts - Agreements
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br />November 23, 1999 <br />. , . i...r~ . ., . <br />, ... . , , ~. . . :',~;', <br />. <,, ,. f~ .. ~ ~ .. <br />- , ~ ~~i.~~~~ <br />, <br />~ , ,, ~ <br />Billy Wasson, Courthouse Square Manager '"'" '' ~ - <br />Marion County Courthouse ARBUCKLE COSTIC ARCHITECTS, INC. <br />100 High Street NE ;~, ; `,<<,', ~ ~~~ ~ ~ ~~ '~ <br />Salem, Oregon 97301 ~ ~ ~~. ~ 'I~ " ~ ~ ' " <br />, ,~ ~? I ~.: i k,i) ',! , <br />RE: Additionai Services Required for LEED Certification. ~~ ~ ~ ~, ~ ~ , ~~~.: ~~~~ ~' ~~~ ~'~ ~~~ ~~'~ ~~ ~>~~ ~ ~ <br />Courthouse Square <br />Project No. 9828 <br />Dear Billy: <br />We are pleased to offer additional services to assist the Project Team in implementing measures which would <br />help in obtaining LEED certification for the project. The tasks required to achieve certification which are not <br />already covered in our contract for services include the following: <br />1. Energy Efficiency Level 1: Title 24 Code Compliance Assessment. <br />2. Construction Indoor Air Quality Levels 1 and 2. <br />3. Implementation of Permanent Air Monitoring Systems with V.O.C. Sensors in Return <br />Air System. <br />4. LEED Certification of Designers. <br />The fees for each of the above line items are as follows: <br />1. Energy Efficiency Level 1: <br />a. Interface Engineering: $750.00 <br />b. Architect Meetings and Coordination: 250.00 <br />i. Subtotal: $1,000.00 <br />2. Construction IAQ Levels 1 and 2: <br />a. Interface Engineering: $2,000.00 <br />b. Architect, Meetings, Coordination <br />and Documentation 500.00 <br />i. Subtotal: 2,500.00 <br />3. VOC Sensor Implementation <br />a. Intertace Engineering: $500.00 <br />b. Architect: 250.00 <br />i. Subtotal: 750.00 <br />4. LEED Design Certification: <br />a. Interface Engineering: $800.00 <br />b. Architect: 800.00 <br />i. Subtotal: 1.600.00 <br />Subtotal: $5,850.00 <br />Overhead 8 Profit (10%) 585.00 <br />Total $6,435.00 ~ <br />U~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.