Laserfiche WebLink
AUG-?1-98 FRI 16;02 ARBUCKLE COSTIC ARCH INC FRX N0, 5035813655 <br />To: Loonard Lodder From: Archilectural Cos( Consuha~rtS. LL(Date: 8/21198 Tlme: t4:3427 <br />Caurthouse Square <br />Court 8 High Street <br />Salem, Oregon <br />ArbuoMe Costio Architects. Inc <br />Des{an Davelaoment Proba~le Cos[ Esiimate <br />L--~-~---- ---..... <br />Architcctural Cost Consultants, LLC <br />James R. Jerde, AIA - Stanley .1. Pszczolkorvald, AIA <br />844'i uW Canyon Court, Suita t03 <br />Portfand, Oregon 97221 <br />Phane (503) 2~37•7210 Fax (503) 2f~7•i187 __ <br />Estimate Date: R21-Au~98 <br />Document Date: 2P.Ju~.SB <br />Print Date: 21-Aug98 <br />Print Time: 02:25 Ptvi <br />Constru~tion Start: Sprins~ 99 <br />DtRECT CONSTRUCTION COST SUMMARY <br />Ccmponent Area $ f SF Cost Comments <br />Building Shall ~ Core 153,343 sf 73.46 11,262,900 <br />Parking 70,793 sf 42.67 3,020,St2 <br />Sus Mall 66,528 sf 37.63 2,503,582 <br /> <br />SubtOtal .. ._......__ <br />22a,13~ sf 74.90- $16,7$6,995 <br />Streetscape 33,720 sf 5d.15 1,691,150 <br />su~coial ss.~ao st 50.~5 $1,891,150 <br />iI <br />T~nant Finishes <br />Grounci Level Tenant Finishes 13,936 sf 42.85 586,862 <br />Second Floor Tenani Finishes 27,552 sf 17.49 481,994 <br />Third Floor Tenant Finishvs 28,279 sf 24.68 697,318 <br />~ <br />Fourth Floor Tenant Finishes 28,279 sf 22.72 642,601 ~ <br />FikhFEoorl~enantFinishPs "~_..._~ 524'203 <br />B8 <br />3 <br /> ~ <br />z $2,9a2.s7a <br />flost -._ <br />258 <br />TOTAL DiRECT CONSTRUC310N COST $21>421,~t23 j <br />Budget~_~a ..,w.._,__.__~__ ~ -~ <br /> <br />Indicated Surplus! (Def~cit) (21,421,123} <br />ALT~RNA7~S <br />1 Parking Alternate 1 23,273 sf Add s 930,300 <br />2 Parking Atternatp 2 t9,d67 sf Add t 808,500 ~ <br />30 d <br />40 ~ <br />Th~ above estimates ara for dirad construdion cost only. They da not include fumishings & equipmen[, Consuliant <br />fees, inspection and testing fees, plan check fees, hazardous maFerial testiing and removal, financiny cosLs, nor any <br />other normaily 3ssociated deve{opment costs. <br />The above estimates assume a corrspetitively bid pmject, with at least three qualified b'tdders in each of the major <br />sub-trades as wall as the generai contractors. All work to be contsactad at one time (sheli & core, street & bus mall and <br />tenant improvements), If project is to be ph2s2d, additional cost associated with phasing to be added. <br />The above estimate5 a~sume a construction start dat? af; S~.ring 99 If the start of construction is delayed <br />beyond the d~te abo~e, the. estimates must be indexed at a rate of 4-G~a per year compoundad. <br />