My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. 5ection 01200 - Project Meetings. <br />H. section 01300 - submittals. <br />I, section 01400 - Quality control. <br />J. Section 01500 - construction Facilities and <br /> Temporary Controla. <br />K. Section 01505 - Construction Waste Management. <br />L. Section 01600 - Materials and Equipment. <br />M. Section 01630 - Substitutions. <br />N. Section 01700 - Contract Close-out. <br />WASTE MANAGEMENT GOALS <br />A. The owner has established that this Project shall <br />generate the least amount of waste possible and <br />that processes that ensure the generation of as <br />little waste as possible due to error, poor <br />planning, breakage, mishandling, contamination, or <br />other factors shall be employed. <br />B. of the inevitable waste that is generated, as many <br />of the waste materials as economically feasible <br />shall be reused, salvaged, or recycled. waste <br />disposal in landfills shall be minimized. [REFER <br />TO SECTION 01094 - DEFINITIONS FOR TERMS USED IN <br />THIS SECTION.j [FOR PURPOSES OF THIS SECTION, THE <br />FOLLOWING DEFINITIONS APPLY: REUSE, SALVAGE, <br />RECYCLE, RETURN.] (EDIT STATEMENTS ABOVE ACCORDING <br />TO WHETHER THIS SECTION (01505) IS INTEGRATED INTO <br />THE SPECIFICATION OR WHETHER IT IS USED AS A <br />STAND-ALONE SECTION. - <br />C. With regard to these goals the Contractor shall <br />develop, for the Architect~s review, a waste <br />Management Plan for this Project. <br />WASTE MANAGEMENT PLAN <br />A. Draft Waste Management Plan: Within [SPECIFY TIME <br />FRAME] [10 CALENDAR DAYS] after receipt of Notice <br />of Award of Bid, or prior to any waste removal, <br />whichever occurs sooner, the Contractor shall <br />submit to the owner and Architect a Draft Waste <br />Management Plan. [SEE APPENDIX D FOR A SAMPLE <br />WASTE MANAGEMENT PLAN WHICIi CAN BE APPENDED TO <br />PROJECT SPECIFICATIONS.] <br />The Draft Plan shall contain the following: <br />1. Analyais of the proposed jobsite waste to be <br />generated, including types and quantities. <br />2. Landfill optiona: The name of the landfill(s) <br />where trash will be disposed of, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.