Laserfiche WebLink
COR #165 20 $ 941.00 Provide set aside space for future security desk per PR #69 <br />2 $ 2,351 $ 590 B <br />COR #172 20 $ , <br />975.00 Provide paging system per PR #47 w/346 speakers per County plan dated 9/9/99 <br />49 $ 39,945 $ 10,030 B <br />COR #174 20 $ , <br />542.00 Provide security screen at waiting room #3237 per PR #79 <br />1 $ 1,542 $ - CO <br />COR #182 20 $ , <br />472.00 Provide spot cooling for AV room 1253 per PR #61 <br />9 $ 4,736 $ 4,736 50/50-CCN <br /> , <br />00 Provide additional rebar at elevator walls at roof per supplemental structural drawing dated 12/8/99 $ <br />788 630 $ 158 B <br />COR #189 <br />COR #190 20 <br />20 $ <br />$ . <br />047.00 Provide support for framework Q airshaft per RFI # 351 and 305 <br />2 $ 1,420 $ 627 P <br />COR #192 20 $ , <br />612.00 Provide column rype C-16 and shear head @ grid 3C per RFI # 332 <br />1 $ 1,118 $ 494 P <br />COR #195 20 $ , <br />887.00 Provide NO-CHASE series 4G grease duct system to meet duct chase code requirement <br />2 $ - $ 2,887 TO <br />COR #197 20 $ , <br />413.00 Provide photocells (Daylight Harvesting) per PR #55 <br />9 $ 7,524 $ 1,889 B-Solid Waste <br />COR #199 20 $ , <br />380.00) Leave ducts located on P1 unpainted per VER #119 <br />(1 $ (957) $ (423) P <br />OR #200 20 $ , <br />00 Provide finish changes to Transit area 1175, Lobby 1200, 1240 and Corridor 1131 per PR #67 <br />720 <br />1 $ 1,375 $ 345 B <br />C . <br />, <br />two hose bibbs with freeze proof fauce[s at the east and west mechanical shafts <br />00 P <br />id <br />710 $ 1,367 $ 343 B <br />COR #201r <br />COR #202 20 <br />20 $ <br />$ rov <br />e <br />. <br />1, <br />206.00 Provide exhaust duct from air room P298 per PR # 84 <br />3 $ 2.224 $ 98z P <br />COR # 203 20 $ , <br />977.00 Provide changes to detail 5/A2.8 per RFI # 453 $ - $ 977 TO <br />COR #204 20 $ 617.00 Provide additional water closet to room 1272 per revised PR #82 <br />1 $ - $ 1,617 TO <br />COR #209 20 $ , <br />249.00 Provide columnette for precast at grid 10-B per RFI # 315 $ 173 $ 76 P <br />COR # 40 21 $ 392.00) Provide changes to fire rating of Lobby 1200 per PR #10 <br />(3 $ ~2,~~ ~~ $ ~68~ ~ B <br />COR #141 21 $ , <br />327.00 Provide changes to Transit Operations Rooms per PR #70 and RFI 410 <br />10 $ - $ 10,327 TO <br />COR #176 21 $ , <br />(499.00) Provide changes to parking garage entry gate and barrier arms per PR #80 $ (346) $ (153) P <br />84 21 $ one @ ea. RAS. Sensors to be wired to units and signal alarm Qa BMS $ <br />00 Provide two VOC sensors <br />4 <br />915 3,929 $ 986 B-Solid Waste <br />COR #1 <br />COR #193 21 $ , <br />, <br />. <br />474.00 Provide for increased column sizes per RFI 362 $ 379 $ 95 8 <br />COR # 194 21 $ 997.00) Eliminate hand dtyers and replace with towel dispensers per PR #66 <br />(4 $ (3,994) $ (1,003) B <br />COR #196 21 $ , <br />736.00 Provide for HVAC sorkstation to be located at the Courthouse building via coax data line <br />1 $ 1,388 $ 348 B <br />COR #198 21 $ , <br />451.00 Provide conduit, junction boxes and blocking for CCN cameras per PR #62 <br />3 $ 1,726 $ 1,726 50/50-CCN <br />COR #205 21 $ , <br />299.00 Provide tapered insulation at mechanicai chases between rooftop air handling units <br />1 $ 1,038 $ 261 B <br />COR #206 21 $ , <br />876.00 Provide graphic behind transit counter per PR #75 and RFI 430 <br />1 $ - $ 1,876 TO <br />COR #210 21 $ , <br />059.00 Provide cold water shutoffs for ice makers per RFI 464 <br />1 $ 846 $ 213 B <br />COR #211 21 $ , <br />037.00 Provide non-FP sill cock in canopy along grid "7" at "J" <br />2 $ - $ 2,037 TO <br />COR #212 21 $ , <br />824.00 Provide power for future waste disposal units per PR #90 <br />3 $ 3,057 $ 767 B <br />COR #213 21 $ , <br />843.00 Provide plate stiffeners per RFI 372 $ - $ 843 TO <br />B <br />COR #214 21 $ 168.00 Provide DA 431 seismic ties at all window jambs in lieu of type specified <br />1 $ 934 $ 234 <br />COR #215 21 $ , <br />793.00 Provide a canister humidifier in CRU-1 unit $ 634 $ 159 B <br />COR #216 27 $ 611.00 Provide blocking with 2X support at the top of the RTU curbs per RFI 475 <br />1 $ 1,288 $ 323 B <br />COR #217 21 $ , <br />031.00 Provide bollards at the southeast corner of site per PR #89 <br />2 $ 1,409 $ 622 P <br />COR #218 21 $ , <br />388.00 Provide indoor air quality (IAQ) management plan per PR #78 <br />6 $ 5,106 $ 1,282 B <br />COR #219 21 $ , <br />326.00 Provide increased protection at sump pumps and generator per PR #91 <br />1 $ 920 $ 406 P <br />COR #SSr 22 $ , <br />929.00 Provide changes to door hardware per PR #24 (w/cardreaders) <br />48 $ 39,109 $ 9,820 B <br />COR #163r 22 $ , <br />309.00 Provide changes to deck in northwest of site per PR #53 <br />10 $ 7,150 $ 3,t59 P <br />COR #220 22 $ , <br />625.00 Provide modification to reception counter in rm #5120 per PR #93 <br />3 $ - $ 3,625 TO <br /> , <br />vide card readers and exit sensors for 11 doors. Conduits, BB and power in PR #52 <br />00 P <br />17 <br />946 $ 14,344 $ 3,602 B <br />COR #222 <br />COR #224 22 <br />22 $ <br />$ ro <br />, <br />. <br />- Provide add'Rional 100 amp, 2771480V panels to serve future needs and 3 phase FPB's $ - $ - NC <br />COR #225 22 $ 267.00 Provide furring over clips around window per RFI 227 <br />6 $ 5,009 $ 1,258 B <br />COR #226 22 $ , <br />630.00 Provide voice chips Q Elevators <br />FI 227 <br />' $ <br />$ 437 <br />248) <br />(2 $ <br />$ 193 <br />(993) P <br />P <br />COR #227 22 $ line and luminaires w/bases per R <br />(3,241.00) Eliminate two flag poles on'B , <br />COR #228 22 $ 941.00 Provide three additional fire extinguishers and four additional cabinets per RFI 380 $ 752 $ 189 B <br /> 22 $ 00 Provide increased depth of inetal deck and increased gauge of bracing in bridge deck per RFI 4 <br />4 <br />557 80 $ - $ 4,557 TO <br />COR #229 <br />COR #231 22 $ , <br />. <br />- Change doors and relites P240A and P2408 to aluminum instead of H/M $ - $ - NC <br />COR #233 22 $ 613.00 Provide interior signage modifications per PR #94 <br />2 $ 2,089 $ 524 B <br />COR #235 22 $ , <br />24,137.00 Provide brick pavers to bus mall aprons per PR 98 $ - $ 24,137 TO-Streetscape <br />COR #236 22 $ 478.00 Provide add'Rional duplex outiets and teledata outlets per PR #39 <br />96 $ 77,115 $ 19,363 B <br />COR #238 22 $ , <br />289.00 Provide additional rebar per structural engineers report of 2/24/00 $ 200 $ 89 P <br />COR #239 22 $ 385.00 Provide closures for aluminum composite panels at canopy supports per RFI 455 <br />1 $ - $ 1,385 TO <br />COR #242 22 $ , <br />429.00 Provide 30"X"30" access panel for grease duct per RFI 474 $ - $ 429 TO <br />COR #243 22 $ 277.00 Change doors 1173 A and 1175 D to Oak per RFI 498 $ - $ 277 TO <br />