Laserfiche WebLink
DATE/TIME 10/13/98 09:58 <br />TYPE Addendum to Plans <br />OCCUPANCY R-3 <br />CONST TYPE V-N <br />UGB: SITE: FD <br /> <br />BUILDING PERMIT <br /> <br />PERMIT NO <br />STATUS <br />ISSUED <br />TO EXPIRE <br />PAGE <br /> <br />98-08837 <br />ISSUED <br />10/12/1998 <br />04/11/1999 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETBACKS: Front: Left: Right: Rear: Special: <br /> <br />1. CALL BEFORE YOU DIG .... IT'S THE LAW. <br /> ATTENTION: Oregon law requires you to follow rules adopted <br /> by the Oregon Utility Notification Center. Those rules are <br /> set forth in OAR 952-001-0010 through OAR 952-001-0090. You <br /> may obtain copies of the rules by calling the center. <br /> (Note: The telephone number for the Oregon Utility Notifica- <br /> tion Center is (503) 232-1987). <br />2, THIS ADDENDUM WAS COMPLETED BY DWALTERS ON 10/13/98. <br /> THIS IS AN ADDENDUM TO 98-08827, <br /> THE FLOOR SYSTEM IN THE LOFT WAS CHANGED TO SJIS. THE ROOF <br /> COVER WAS CHANGED TO FIBERGLASS SHAKES. THE FRONT WALL WAS <br /> CHANGED TO AN ENGINEERED LATERAL DESIGN. <br />2. Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government. <br />4. SJI FLOOR JOISTS SHALL BE INSTALLED AS PER THE MANUFACTURERS <br /> WRIl-[EN INSTALLATION INSTRUCTIONS. <br />5. IHE ROOF TILE ARE MIRA VISTA SHAKE SHINGLES, THE MANUFACTUR <br /> ERS WRI1-FEN INSTALLATION INSTRUCTIONS MUST BE AVAILABLE TO <br /> THE INSPECTOR AT THE TIME OF INSPECTION! THE INSPECTION <br /> WILL NOT BE SIGNED OFF WITHOUT THESE INSTRUCTIONS. <br />6. ENGINEERED FRONT WALL BY KEN COBB # 16767, <br /> <br /> <br />