My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SESPNEW - 1529933
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
98-XXXXX
>
SESPNEW - 1529933
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2010 9:37:47 AM
Creation date
12/29/2004 8:29:44 AM
Metadata
Fields
Template:
Permits
Permit Address
9971 BROWNELL DR SE
Permit City
Aumsville
Permit Number
555-98-08750
Parcel Number
081W19 01100
Permit Type
SESPNEW
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DATE/TIME <br />TYPE <br /> <br /> SITE EVALUATION/SEPTIC PERMIT <br /> 11/12/98 11:10 PERMIT NO 98-08750 <br /> SESP STATUS ISSUED <br /> ISSUED 11/13/1998 <br /> TO EXPIRE 11/13/1999 <br /> PAGE <br /> in the area and adversely affect the septic system approval, <br /> The areas of the initial septic system and the future repair <br /> system must both be protected. <br />5. A CURTAIN DP~qIN IS REQUIRED as part of this system. The <br /> curtain drain trench must be constructed a mimimum twelve <br /> (12) inches wide by 48 inches deep with 28 inches <br /> of clean gravel placed over a four (4) inch smooth wall. <br /> perforated pipe. The curtain drain must be located at least <br /> ten (10) feet upslope from the disposal field and must <br /> discharge through a watertight non-perforated pipe beside or <br /> below the disposal field. A minimum separation of ten (10) <br /> feet is required from the septic tank if the tank is located <br /> upslope of the curtain drain and five (5) feet ~f the tank <br /> is located downslope of the curt~an drain. <br />6. OBSERVE ALL SETBACKS AND SEPARATION DISTANCES as required by <br /> the DEQ rules, The well placement is especially critical <br /> and must be located at least one-hundred (100) feet from the <br /> approved initial and replacement drainfield areas, A copy <br /> of the DEQ setback requirements is available in our office, <br />7, ll~IS SYSTEM MUST BE INSPECTED AND APPROVED PRIOR TO BACKFILL <br /> When work is complete and ready for inspection, call our <br /> Automated Inspection Request line at 272-4427 to request an <br /> inspection. Enter the number "801" for a PRE-COVER ~nspec- <br /> tion. You may leave a message for the inspector if desired, <br /> Be sure the System Record form with the As-Built drawing <br /> on the job or in our office when the inspection is requested <br /> An inspection should be completed within seven (7) days. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.