Laserfiche WebLink
DIRECTOR <br />Craig O. Luedeman <br /> <br />BUILDING INSPECTION <br />{503J 588-5147 <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br /> DEPARTMENT <br /> <br />MEMO: <br /> <br />Date: Nov. 17, 1998 <br /> <br />To: Gabriel Vassa Molodyh <br /> 23006 Bents rd.. NE <br /> Aurora, OK 97002 <br /> <br />From: Zan Ewing <br /> <br />Re: Septic application 98-08221 <br /> <br />Dear Mr. Molodyh, <br /> <br /> As I mentioned to you on the telephone yesterday, I visited your property on 11/9/98 <br />to evaluate you~ site for the installation of a system to serve a 40 person farm labor camp. In <br />addition, you had exposed a portion of the of the drainlines to see if they arc suitable to be <br />considered as a part of the septic system since this was evidently done without permits or <br />inspections. <br /> First, the flow for this proposed facility is to be calculated at 1000 gallons per day <br />as per a D.E.Q. a memo on a similar facility. The septic tank is required to be sized at two <br />times the daily sewage flow or 2000 gallons. The existing septic tank is 1000 gallons so is <br />inadequate in size. The drainfield and septic tank are not allowed in areas subject to traffic <br />or parking so the portion of the drainfield in the parking area cannot be approved. The <br />beginning and ends of the drainfield lines need to be exposed (without damage) to determine <br />if they meet state code for constructions methods, materials etc. <br /> Th/s site is marginally approvable for the installation of a standard dralnfield. A up <br />slope curtain drain will be required to help lower the winter groundwater which the soil <br />review shows is within 20" of the ground surface for some of the winter season. 833 lineal <br />feet of drainfield will be required for this proposal in an area away fi.om the existing <br />drain, lines if they are shown to not meet code. <br /> The system will need to be physically staked out on contour as shown on the <br />attached stakeout sample sheet and a detailed stakeout plan submitted. It may be of help to <br />you to get the assistance of an experienced septic system contractor who is familiar with <br />these procedures. <br /> Give me a call if you would like to discuss this or if you have any questions on this <br />matter. <br /> <br />Community Development Center - 3150 Lancaster Dr NE, Suite C - Salem, Oregon 97305-1398 <br /> <br /> <br />