Laserfiche WebLink
DATE/TIME <br />7YPE <br />OCCUPANCY <br />COMSTTYPE <br />UGB: SITE: <br /> <br /> BUILDING PERMIT <br />09/16/98 15:51 PERMIT NO <br />Commercial addition/alteration STATUS <br />S-5 ISSUED <br />V-N TO EXPIRE <br /> PAGE <br /> <br />98-07894 <br />ISSUED <br />09/16/1998 <br />03/15/1999 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETBACKS: Front: Left: Right: Rear: Special: <br /> <br />1, CALL BEFORE YOU DIG .... IT'S THE LA~, <br /> ATTENTION: Oregon law requires you to follow rules adopted <br /> by the Oregon Utility Notification Center, Those rules are <br /> set forth in OAR 952-001-0010 through OAR 952-001-0090. You <br /> may obtain copies of the rules by calling the center. <br /> (Note: The telephone number for the Oregon Utility Notifica- <br /> tion Center is (503) 222-1987), <br />2, THIS PLAN REVIEW WAS COMPLETED BY M. JONES ON 09/16/98, <br />3. Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government. <br />4. This project may be subject to the architectural standards <br /> of the Americans with Disabilities Act of 1990 (ADA). <br /> Issuance of a building permit does not certify compliance <br /> with this Federal Statute. Copies of the guidelines and <br /> information concerning the ADA may be obtained from the <br /> Architectural and Transportation Barriers Compliance Board, <br /> 1-202-652-7834 (Voce/TDD) or 1-800-USA-ABLE. Failure to <br /> comply with the ADA may result in Federal fines and <br /> penalties. <br />5. Local Fire Districts may have additional requirements that <br /> affect this project, You are advised to contact the Fire <br /> District before you proceed. <br />6. This review is not intended to prohibit the building <br /> inspector from requesting an evaluation of the <br /> acceptability of existing structural members that may <br /> appear to be unsafe. Existing construction not <br /> specifically detailed in the plans and structural <br /> calculations is beyond the scope of this review. <br /> <br /> <br />