Laserfiche WebLink
DATE/TIME <br /> <br />OCCUPANCY <br />CONST TYPE <br />UGB: AM SITE: <br /> <br /> BUILDING PERMIT <br />09/14/98 lO:D1 PERMIT NO <br />Resident. addition/alteration STATUS <br />R-3 ISSUED <br />V-N TO EXPIRE <br /> PAGE <br /> <br />98-07632 <br />ISSUED <br />09/14/1998 <br />03/13/1999 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETB~KS: Front: 20 Left: 5 Right: 5 Rear: 5 Special: <br /> <br />1. CALL BEFORE YOU DIG .... IT'S THE LAN. <br /> AI-FENTION: Oregon law requires you to follow rules adopted <br /> by the Oregon Utility Notification Center. Those rules are <br /> set forth in OAR 952-001-8010 through DAR gB2-O01-0090. You <br /> may obtain copies of the rules by calling the center. <br /> (Note: The telephone number for the Oregon Utility Notifica- <br /> tion Center is (502) 232-1987), <br />2. THIS PLAN REVIEW WAS C~PLETED BY S. FREILINGER ON 9/11/98. <br />2. Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government. <br />4. BP, ABP A~ACHED. This structure uses a combination of <br /> Brace Wall Panels (BP) and Alternate Braced Wall Panels <br /> (ABP)to meet the code requir~ents for lateral wall bracing, <br /> Insure that all BP's and ABP s are located as indicated on <br /> the plans and constructed as shown on the plans and the <br /> attached detail sheets. <br />5. TRUSS DESIGN. Roof trusses are required to be designed by <br /> an Oregon registered Engineer or Architect. For trusses <br /> manufactured by an approved fabrication plant, have the <br /> design and layout drawings available at the construction <br /> site for the framing inspeciton. All jobsite cutting or <br /> n~x~iftcation of the roof trusses shall be clearly shown in <br /> the engineers's design calculations and drawings. If trusses <br /> are to be built at the jobsite, submit the engineer's design <br /> and construction plans to the Marion County Building Depart- <br /> ment prior to start of construction and have the approved <br /> drawings available at the site for the framing inspection. <br />6. PROVIDE A SUPPORT BEAM IHTHE ROOF WHERE THE EXISTING WAJ. L <br /> IS TO BE REMOVED - IF THE EXISTING WALL IS A BEARING WALL. <br /> IF THE W~J_L IS NOT A BEARING WALL, NO BEAM OR HEADER IS REQU <br /> IRED. <br /> <br /> <br />