Laserfiche WebLink
Wylee <br />April 8, 1998 <br />Page 2 <br /> <br />Hangar 6 <br /> <br />Hangar 8 <br /> <br />Hangar 12 <br /> <br />plan review. Handrail and guard rails are required for the stairs to the <br />mezzanine. <br />A Conditional Use Permit is required from Marion Planning for operation <br />of a business at this location. Make application and obtain approvals for this <br />use. Sanitary facilities are required to be available on the property when the <br />structure is used for any purpose other than aircrafic storage. <br /> <br />Plumbing - no plumbin4g installed. <br />Electrical - An electrical permit with an investigation fee is required for the <br />additional 4 branch drcuits. Reeeptades are located in a classified area ( 18" <br />above floor). Some wiring is concealed, obtain required permits and make <br />arrangements for inspection of the area~ <br />Structural permits not requked, but post hangar number on the face of the <br />structure. <br /> <br />Plumbing p~,mit with an investigation fee is required for 4 fixtures. Cease <br />all use of the plumbing fixtures until plumbing approved and the system is <br />connected to an approved sewer system. Some areas of the plumbing will <br />need to be exposed for inspection and repair. <br />Elecffical pm~dt with an investigation fee is required for a sub-panel and 12 <br />circuits. Obtain a permit and schedule an inspection. <br />Structural permit with an investigation fee is requked ($12/sq/f~ valuation) <br />for the two story interior office. Provide a floor plan and a cross section of <br />the construction for plan review. <br />Obtain a septic permit or inclusion in a joint system with other hangar <br />owllers. <br /> <br />Plumbing permit with an investigation fee is required for 4 fixtures. Obtain <br />permit and make arrangements for an inspection of the plumbing. Plumbing <br />is not to be used until all approvals are issued. <br />Electrical permit with an investigation fee is required for a sub-panel and 14 <br />circuits. All wiring in conjunction with the rental portion of the hangar are <br />to be performed by a licensed electrical contractor. Remove all non-metallic <br />cable and expose remainder for inspection. <br />Structural permit with an investigation fee is required for the two story <br />interior office addition as well as the exterior deck. Provide a floor plan and <br />a cross section of the construction for plan review. <br />Obtain a septic permit or inclusion in a joint system with other hangar <br />owners. <br /> <br /> <br />