My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUILD - 1512168
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
98-XXXXX
>
BUILD - 1512168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2013 2:07:21 PM
Creation date
11/16/2004 12:10:12 PM
Metadata
Fields
Template:
Permits
Permit Address
11334 IVY LN SE
Permit City
Aumsville
Permit Number
555-98-03564
Parcel Number
081W28 00800
Permit Type
BUILD
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUILDING PERMIT <br />DATE/TIME 05/12/98 11:25 <br />TYPE Residential accessory struct <br />OCCUPANCY U-1 <br />CONST TYPE V-N <br />UGB: SITE: FD <br /> <br />PERMIT NO <br />STATUS <br />ISSUED <br />TO EXPIRE <br />PAGE <br /> <br />98-02564 <br />ISSUED <br />05/12/1998 <br />11/08/1998 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETBACKS: Front: 20 Left: 20 Right: 20 Rear: 20 Special: <br /> <br />1. THIS PLAN REVIEW WAS COMPLETED BY S. FREILINGER ON 5/11/98, <br />2. Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government. <br />3, Approved for private non-commercial use only, <br />4. TRUSS DESIGN. Roof trusses are required to be designed by <br /> an Oregon registered Engineer or Architect. For trusses <br /> manufactured by an approved fabrication plant, have the <br /> design and layout drawings available at the construction <br /> site for the framing inspeciton, All jobsite cutting or <br /> modification of the roof trusses shall be clearly shown in <br /> the engineers's design calculations and drawings. If brusses <br /> are to be built at the jobsite, submit the engineer's design <br /> and construction plans to the Marion County Building Depart- <br /> ment prior to start of construction and have the approved <br /> drawings available at the site for the framing inspection, <br />5. BP. ABP Al-FACHED. This structure uses a combination of <br /> Brace Wall Panels (BP) and Alternate Braced Wall Panels <br /> (ABP)to meet the code requirements for lateral wall bracing, <br /> Insure that all BP's and ABP's are located as indicated on <br /> the plans and constructed as shown on the plans and the <br /> attached detail sheets, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.