Laserfiche WebLink
DATE/TIME <br />TYPE <br />OCCUPANCY <br />CONST TYPE <br />UGB~ SITE: <br /> <br /> BUILDING PERMIT <br />07/08/98 14:52 PERMIT NO <br />New Recreational Vehicle Park STATUS <br />U-1 ISSUED <br /> TO EXPIRE <br /> PAGE <br /> <br />98-02444 <br />ISSUED <br />07/08/1998 <br />01/04/1999 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETBACKS: Front: Left: Right: Rear: <br /> OK AS PER SITE PLAN <br /> <br />Special: <br /> <br />1. THIS PLAN REVIEW WAS COMPLETED BY J TRUSSELL ON 7-7-98. <br />2, Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government. <br />3. THE NEW AGDITIONAL SPACES SHALL BE HOOKED UP TO FARGO SEWER <br /> SYSTEM BEFORE A FINAL APPROVAL OF THE PARK WILL BE ISSUSED. <br /> IF FARGO SEWER SYSTEM IS NOT COMPLETE BY FINAL OF THE PARK, <br /> THE PARK SHALL NOT OPEN OR OCCUPY ANY OF THE NEW SPACES. <br />4, ELECTRICAL PLANS SHALL BE SUBMI1-FED TO MARION COUNTY <br /> BUILDING INSPECTION AND APPROVED BEFORE ANY ELECTRICAL <br /> INSPECTION WILL BE DONE AT THE PARK. <br />5. BUILDING PERMIT REQUIRED FROM MARION COUNTY BUILDING <br /> INSPECTION ON THE PROPOSED REST ROOMS AND SHOWER BUILDING. <br /> THE REST ROOMS ARE REQUIRED FOR THE NEW SPACES. <br />6. EACH CAMPING SPACE SHALL BE LARGE ENOUGH TO ACCOMMODATE THE <br /> DESIGNATED CLASS OF RECREATIONAL VIHICLE AND BE LOCATED A <br /> MINIMUM OF TEN FEET FROM ANY OTHER CAiIPING SPACE, BUILDING <br /> OR BUILDING APPURTENANCE OR ANY BOUNDARY LINE ABUYFING <br /> UPON A PUBLIC STREET OR HIGHWAY, ARQ FIVE FEET FROM ANY <br /> PROPERTY LINE. <br />7. SOLID WASTE CONTAINERS IN RV PARKS SHALL BE PROVIDED AT A <br /> RATE OF ONE 20-GALLON CONTAINER FOR EACH FOUR RV PARKING <br /> SPACES AND BE LOCATED WITHIN 200 FEET OF EACH RV PARKING <br /> SPACE. CONTAINERS MAY BE GROUPED. <br />8, To coordinate our inspections with the building of the park <br /> nofify this office when the following stages of construction <br /> are complete and ready for inspection, before proceeding to <br /> the next stage: <br /> (a) Rough grading: when rough grading of roads and <br /> spaces is completed, <br /> (b) Prior to paving: before any asphaltic concrete or <br /> portland cement concrete is placed and after com- <br /> paction is completed. <br /> (c) F~nal inspection: a final inspection shall be made <br /> after finish grading and all permanent facilities <br /> are in place, <br /> <br /> <br />