Laserfiche WebLink
BUILDING PERMIT <br />DATE/TIME : 03/05/98 07:22 PERMIT NO <br />TYPE : Resident. addition/alteration STATUS <br />OCCUPANCY : R 3 ISSUED <br />CONST TYPE : V N TO EXPIRE <br />UGB: SITE: PAGE <br /> <br />98-00835 <br />ISSUED <br />03/04/1998 <br />08/31/1998 <br /> 2 <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br />REQUIRED SETBACKS: Front: 20 Left: 20 Right: 20 Rear: 20 Special: <br /> <br /> 1. THIS PLAN REVIEW WAS COMPLETED BY R.STEWART ON 3-3-98. <br /> 2, Approval of submitted plans is not an approval of omissions <br /> or oversights by this office or of noncompliance with any <br /> applicable regulations of local government, <br /> 3, WORK MAY PROCEED only at the direction of the inspector. To <br /> request an inspection of completed work, call (503)373-4427 <br /> 24-hour inspection line) prior to 7:00 A.M. to receive the <br /> same day service. <br /> 4, USE THE INSPECTION CODE NUMBERS WHEN REQUESTING INSPECTIONS: <br /> 904 REBAR <br /> 905 TEMPORARY ELECTRICAL SERVICE <br /> 906 FOOTINGS, Stake property lines and call before pour <br /> 907 UNDERFLOOR STRUCTURAL, call before adding subfloor <br /> 908 UNDERFLOOR MECHANICAL, call before adding subfloor <br /> 909 UNDERFLOOR PLUMBING. call before adding subfloor <br /> 911 ELECTRICAL SERVICE, service only <br /> 912 ELECTRICAL PRE-COVER, call before covering <br /> 913 MECHANICAL PRE-COVER. call before covering <br /> 914 PLUMBING TOP-OUT, call before covering <br /> 5. 915 FRAME. call when weather tight, chimney/fireplace <br /> installed, all backing, blocking, stairs, soffits in <br /> place, rough plumbing, electrical, mechanical complete, <br /> truss details posted, flood elevation certification <br /> submitted. <br /> 916 INSULATION, call before covered <br /> 917 DRYWALL, call before taped <br /> 91B SPECIAL BRACE PANEL, call before covering ABP's, Portal <br /> Frames, or Shear Walls <br /> 922 RAIN DRAINS <br /> 923 WATER SERVICE <br /> 924 SEWER SERVICE <br /> 6. 925 GAS PIPING <br /> 926 FIREPLACE, call for throat inspection <br /> 930 DWELLING MECHANICAL FINAL <br /> 931 DWELLING PLUMBING FINAL <br /> 932 DWELLING ELECTRICAL FINAL <br /> 999 DWELLING FINAL, call when building is complete and <br /> ready to occupy. <br /> 7, ACCEPTABILITY. This plan review covers the addition to and/ <br /> or alteration of an existing structure, This review is not <br /> intended to prohibit the building inspector from requesting <br /> an evaluation of the acceptability of existing structural <br /> members that may appear to be unsafe, Existing construction <br /> not specifically detailed in the submitted plans and struc- <br /> tural calculations is beyond the scope of this review, <br /> B. FINISHED GRADE. Footings shall extend not less than 12 <br /> inches below the finish natural grade. Foundation walls <br /> shall extend at least 6 inches above the finished grade <br /> adjacent to the foundation at all points, except 4 inches is <br /> allowed where masonry veneer is used, [Fig. 403,1a, <br /> Section 404.1,3] <br /> 9. ANCHOR BOLTS, Foundation plates shall be bolted to the <br /> foundation with a minimum 1/2 inch diameter by 10 inch <br /> anchor bolts embedded at least 7 inches into concrete or <br /> reinforced masonry and spaced not more than 6 feet apart <br /> with a minimum of 2 bolts per piece with one bolt within <br /> 12 inches of the end of each piece, [Fig. 403,1a] <br />10, UNDERFLOOR VENTILATION, Provide at least one square foot of <br /> underfloor ventilation for each 1500 square feet of crawl <br /> space area. The openings shall be covered with a corrosion <br /> resistant wire mesh, At least one such opening shall be <br /> provided within 3 feet of each corner of the building, <br /> Vents may be omitted on one side. [Sec, 409,1] <br />11. UNDERFLOOR DRAINS, The finished grade oF the underfloor <br /> surface may be located at the bottom of the footing; however <br /> <br /> <br />