Laserfiche WebLink
,/21~1998 ~07:27 <br /> <br />CONSUL?ANT · <br />CERTIFIIrD W^'fL~ RJ~'f~E~AMINER J~BION COUNTY FAX 503,.~.S,1m <br /> BUILDING INSPECTION <br /> <br />Januazy 20, 1998 <br /> <br />Ramonn Hudson <br />A~ing City <br />City of <br /> <br />PO Box 225 <br />A~,Ofe,o~97325 ~ I L E <br /> <br />Re: Flood Plain Development P~'mit <br /> Plncement ofMobile .q~ <br /> Capitol Concrete Constm~ion <br /> <br />Dear Rnmona; <br /> <br />On January 16, 1998 I rcccivcd an application for Permit to Develop in the Flood Plain i)r thc <br />placem~t ora slxuctw~ hxtbe 100 year flood plain of iht Mill Race of Mill C~ek. The FEMA Map <br />( August 17, 1982) showsthe I00 year flood base ele.,ation nearest the proposed str~ure as being <br />356.5. The actual elevation of the area where the proposed structure is to be placed is 365.0 <br />accordin~ to a topographic survcy completed by thc applicam's cnginccr. Rs can be seen, the <br />proposed site is much higher than the base elevation as shown on thc FEMA Map; a~d therefore is <br />not within tl~ I00 year flood plain, A Flood Plain Development Permit is not required. <br /> <br />I have also Iook~d at lhe new proposed site plan thai was submitted to meet l~e requirements of the <br />Site Development Revicw, nmi find that it meets with my approval. <br /> <br />cc: Planning Co..,~ssion <br /> <br /> <br />