Laserfiche WebLink
{FO~ OFFICE USE ONLY[ MARION COUNTY BUILDING INSPECTION <br /> COMMUNITY DIFv~LOPMENT CENTER <br />] Received by: } 285 Church St. NE - Room 132 <br />{ Date: { Sale, l. Oregon 97301 <br /> phou~ 588-5147 8.'00 ~.nx ~ 4:30p.m. S]T~ ~i <br /> <br /> Issued by: <br /> <br />LOCATION OF INSTALLATION <br /> <br /> BUIL{?IN~} IN~il E~ <br /> <br />Direct[oas <br /> <br />PEKMITS AICE NON-TRANSFERABLE AND NON-REFUNDABLE AND <br />EXPIRE IF WORK IS NOT STARTED WITHIN 180 DAYS OF ISSUANCE <br />OP. IF WORK IS SU SPI~VDED POP. lg0 DAYS. <br /> <br />2A. CONTRACTOR INSTALLATION ONLY <br /> <br /> ' <br /> <br />Contractors Licenso No. <br /> <br />Contrac~oFs Signat~ ~ <br />2B. FOR OWNER INSTALLATIONS <br /> <br />Property Owner <br />Mailing Addn~ss Phone <br />City/State/Zip <br /> <br />Th~ installation is being made on property I own which is not intended for sale, <br />lease, or wnt. <br /> <br />Owner's Signature <br /> <br /> ~. PLAN REVIEW SECTION <br /> <br />Forced Air Furnace $ 6.00 <br />100,000 BTU or <br />Over 100,000 BTU -- $ 7.$0 <br /> <br />FloorFumace __ $ 6.00 <br />Suspended Heater __ $ 6.00 <br />Wall Heater __ $ 6.00 <br />Floor Mortared Unit Heater __ $ 6.00 <br /> <br />H~t Pump [] / Air Conditioner <br />Up to 3 Ton ~ $ 6.00 <br />3 Ton to lS Ton __ $11.00 <br />Evaporative Cooler $ 4.50 <br />.Fddmnst System, Commercial __ $ 4.50 <br />Hood and Exhaust, Commercial __ $ 4.50 <br /> <br />Domestic Range Hood $ 4.50 <br />Domestic Exhaust Fans <br />and Dryer Vents __ $ 3.00 <br />Fire Damper __ $ 3.00 <br />WoodStove __ $ 7.50 <br />Furnace Ducfs (Alteration, Ext~asion) __ $4.50 <br /> <br />Commercial or Industrial Incinerator <br /> <br />Gas Water Heater (relocation <br />orreplaoemant) __ $ 7.50 <br />Gas Conaoction ,- <br />-pea' outlet, up to 4 __ $ 2.00 <br />--over 4, $8.00 plus ea. <br />additional $ .50 <br /> <br />For the Installation, Relocation <br /> or Replacement of ea. Appliance <br /> V~t not included in an <br /> Appliance permit. <br /> <br />Other (as requited by BuiLding Offtcia[) <br /> <br />__ $ 3.00 <br /> <br />We will provide plan review service if you complete Section <br />' 5B and submit two (2) sets of plans and specifications with <br />this application. <br /> <br />This optional plan review program does not suspend the <br />required submission of plans, and specifications when required <br />by the Oregon Structural Specialty Code, Chapter 53. <br /> <br />MC 15-41 <br />Rev. 8/94 <br /> <br />5. FEES <br /> <br /> Al. Add 5% ~urel~ge (.05 x A 1 ) <br /> <br /> <br />