Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE · Room 132 · Salem, Oregon 97801-3670 <br />Office Hours: 8:00-4:30 * Phone: (~03) 588-5147 · 24-HR Inepectlon Line: (503} 37;~-4427 <br /> <br />DATE/TINE <br />TYPE <br />OCCUPAHCY <br /> <br /> SEPTIC PERHIT <br />'. 83/13/97 1~1.'19 PERHIT HO <br />-' SP STATU~ <br />I R-3 TSSUED <br /> TO EXPIRE <br /> P~GE <br />and the length qf drainfield. An znspection should be <br />completed wlthit~ seven (7) days. <br />A capping fill dra~nfield is required in con~unction ~i~h <br />fhe septic system approval. See the attached "Cappi~o Fill" <br />information sheet fbr instructions. - <br />CAPPING FILL SYSTEH~ shall be constructed between Jut~e ~ <br />and October 1 or during such times when B~ilding Inspection <br />staff finds soil moisture conditions acceptable. The <br />~APPING FILL ~ateriel must be inspected and approved prior <br />fn placement. The f~ll shall be of the same ~extural <br />cla~s, or one class finer, the~ the native topsoil. The <br />disposal fie].d area must be scarified to destroy any <br />v~geta~ive ~at on'the surface. Fill material shall be <br />evenly g~aded ~o a final depth of sixteen (16) inches over <br />the gravel. <br /> <br />: 97-80511 <br />: ISSUED <br />: 83/13/1997 <br />: 83/13/179S <br /> 3 <br /> <br /> <br />