Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> 285 Church Street NE * Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 · Phone: (803) 588-5147 * 24-HR Inspection Line: (503) 373-4427 <br /> <br />~TE/T~I~' <br />T'TPE <br /> <br /> ~TIOI4 <br /> <br /> = esl2&/96 17114 PERNZT NO <br /> = Resident. addition/alteration ~T~TU9 : <br /> : ~lli~ addition/alteration I~ED : ~/26/1996 <br /> ~ R-3 TO EXPI~ : ~2/22/1~7 <br /> : V~ P~ 3 <br /> <br /> 2. ~n uncoated Ho. 4 reinforcing bar stqbbed up at lea~t <br /> 12 ~nches above ~he floor prate l~n~ a~d t~ghtly at~acned to <br /> the re~nforc~n~ oar.located ~ the too~ing. The spliced l~p <br /> of the staubbeo up oar to the foot~n~ shall be <br /> ~2 inches. (See Section 41~.1.2) [Sec. 4~3.43 <br />11. ~P~ ~BP. This structur~ uses a combination of ~race ~all <br /> Panels (BP) and ~lterna~e Braced ~all Panels (R~P) to ~eet <br /> the code requirements for lateral ~all bracing. Insure that <br /> all BPVs are located as ~d~cated o~ the pla~s. <br />12. H~NDR~[LS ~aving a ~i~i~u~ and.~axi~u~ height.of 3~.ipche~ <br /> and 38 incnes~ respectiveay~ shall be proweeo on <br /> one side of stairways of ~ore than three r~sers. ~11 re- <br /> quired handrails shall be continuous.the full length of the <br /> stairs. ~nds shall be returneo or snell terRinate <br /> posts or safety terminals. Exception: Handrails RaX be <br /> interrupted by a ne~el ~ost at a turn, a~ the use of <br /> volute turnou~ or starting easing shell be a11o~ed over the <br /> lo~est tread. [Sec. 315.13 <br />13. GU~RDR~L OH ~Td[RS. Open s/des of stairs ~ith a total rise <br /> or ~ore than 3~ inches above the floor or grade belo~ shall <br /> have guardrails not less than 34 inches in height ~easured <br /> yertica11y fro~ the nosing of the treads, guardrail shall <br /> nave [n~er~edtate rail~ or ornamental closures ~hich <br /> not a11o~ passage of an object ~ inches or Rote in d~a~eter. <br /> Horizontal spaczng between the vertical ~e~bers in required <br /> guardrails shall be a ~axi~u~ of 4 inches at the nearest <br /> point between the ~e~bers. [Sec. 31~.3~ <br />14. EIJ~RDERILS ~HD HRHDR~LS shal~ be able to resist a <br /> concentrated load of 2~e pounos applied i~ any direction at <br /> any point alon~ the top. [Table <br />]5. SNOKE DETECTORS shall be installed in each sleepin~ roo~ <br /> outside of each separate sleeping area in the <br /> vicinity of the bedrooms and on each additional story of the <br /> d~e11~pg.~ncluding base,ants.. ~11 detectors shall be inter- <br /> connectee such that the actuation of one alar~ ~ilI actuate <br /> all the alarms in the individual u~it a~ sha~[ provide <br /> alar~ ~hich ~ill be audible in ali sleep~no areas. <br /> ~Section ~1~.1] S~oke detectors shall be ~1~ volt ~ith <br /> batter back-up. [Sec. 31~.23 <br />1~. S~OKE ~ETECTOR / PO~ER. Required s~oke detectors shall <br /> ~ecetve their pri~arX ~o~er fro~ the building ~iri~g ~hen <br /> such ~iring ~s served fro~ a commercial source~ and ~hen <br /> ~rzRary po~er is interrupted~ sha~l receive po~er fro~ a <br /> artery. S~oke detectors ~ay be battery operated ~hen <br /> ~nstalled in buildings ~tthout commercial ~o~er.[Sec. <br />17. BEARS NAY PROJECT HOT HORE THRH 6 [HCHES BELO~ THE REgU[RED <br /> CEiLINg HEIGHT OF 7 FT. 6 [H. (7 FT. H~N. ~BOVE THE FLOOR). <br /> [~EC. 3~5.1~ EX. <br /> <br /> <br />