Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> o85 Ohuroh 8troot NE · Room 1So · Salem, Oregon 07301-3870 <br />Offloo Hours: B:00.4:30, Phone: (803) 888-8147 · 2A-HR Inspootlon Uno: (SOS) <br /> <br />JIRED SETBACKS~ <br /> <br />Front: <br /> <br />PLAN REVIEW COMMENTS AND CONDITIONS <br /> <br /> Left: Right: Rear: Special: <br /> <br /> 1. ]'HIS PLAN REVIEW WAS COMPLETED DY M. JONES ON 06/03/96. <br /> 2. Approval of submitted plans is not an approval of omission,~ <br /> or oversights by this office or of noncompliance with any <br /> applicable ~egulations of local government. <br /> ~, Approved address numbers shall be painted or affixed to the <br /> frbnt of the building in a contrasting and highly visible <br /> colo?~ not less than six (~) inches in height for <br /> commercial use o? four (4) inches in hei~h~ for residential <br /> use. The nembers shall be affixed prior ~o final <br /> inspection. (513) (UFC 1B.3~l) (ORD 774) <br /> 4.~ A roadside ma?kef shell be pieced at the access point with <br /> add?ess numbers in a contrasting and highly visible color, <br /> ~ot less ~han five (5) ~nches in height for commercial use~ <br /> or three (~) ii, has in height fo? residential use. <br /> 5. The INSPECTION RECORD GRE? CAR~ shall be posted i~ a <br /> visible and readily acce~.,ible location throughout <br /> construction. <br /> APPROVED CSHSTRUCTIQH PLA~S AND PLA~ REVIEW COMMEWTS AND <br /> O)ND[TIOHS shall be kept o~ the site of the buildin9 or work <br /> at the time of inspection. <br /> 6. Work May proceed o~lx mt ~he direction of the i~spector. <br /> To request mn inspectio~ of completed work~ DIAL <br /> (583~ 373-4427 (~4-hour <br /> <br /> 7. USE INSPECTION ~ODES WHEN REQOESTINO INS~CTIONS: <br /> lB2 - FOOTINGS. stake property lines and call before pour <br /> l~ UNDERFLOOR/POST ~ DEAN <br /> lB4 - FRAMING, call when weather tight, chimney/fireplace <br /> installed, all backing~ <br /> soffit~ i~ place~ plumbin~ electrical, mechanical <br /> complete, truss d~ails.posted, flood elevation <br /> cer~ti fication suomittea. <br /> 185 - I~SUL~TIOH~ call ~efore covered <br /> 18~ - DRYWALL - call bezo~ ~aped <br /> lg7 - PObE HOLES, call he,ore pour <br /> 8. 188 - FOUHDATIOH WALL REBAR <br /> 1tB - MASONRY REBAR <br /> 111 - SPECIAL BRACE PANELS <br /> 112 MASONRY FIREPLACE PRE-~OVER <br /> ]13 - SUSPENDED CEIL <br /> 114 - ROOF HAILINg <br /> 115 - DEMOLITION INSPECTION <br /> 116 - O~HER STRUCTURAL INSPECTION <br /> 1~ - STRUCTURAL FINAL <br /> 9. This is mn addendum to Permit ~95-].7885. <br /> This addendum covers the Foundation Plan revisions or~ly. <br /> Holdown devices were added to this Foundation Plan and all <br /> the footinqs shall be as per the FOOTIHg SCHEDULE. <br />18. Plans sh~ 2.1 shall be used in conjunction with this <br /> revised Foundatio~ Plan. <br /> <br /> <br />