Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br /> COMMUNITY DEVELOPMENT CENTER <br /> <br /> DATE/TIHE <br />TYPE <br /> CLA~ <br />OCCUPN"ICY <br />'CDH,~rRUCT[OH <br /> <br /> 285 Church Street NE * Room 132 · Salem, Oregon 97301-3670 <br />Office Hours: 8:00-4:30 · Phone: (503) 588-5147 · 24-HR Inspection Line: (503) 373-4427 <br /> <br /> BUILD[I~ PERHIT <br /> · . ~7/17/96 97.-81 PERHZT NO ~ 96--e451! <br /> : Resident. addition/alteration ~ATUS : ISLED <br /> : D~elling addition/alteration ISS~D : ~7/17/1996 <br /> : R-3 TO EXPIRE : ~1/13/1997 <br /> : V-g PAgE <br /> inche~. <br /> All eqress or resKue windows fro)~) sleeping rooms Must have <br /> net clea~~ opm)ing of 5.7 squmr~ feet. The ~ini~uM net clear <br /> opening heiqht sh~ll bm 22 inches. The M~iMUM net clear <br /> openin~ width shall be 28 inches. (~I8.2 & 318.2.1) <br />11. ALTERATIONS, REPATRS & AQQITIONS. When alteratio)~s, repmirs <br /> or additionsrequiring m permit occur~ or when one or More <br /> ?~l~eeping rooms are a~ded or created in existing dwellings, <br /> t~e entire buildinq sh~ll be provided with sMoEe detectors <br /> )~,~ted ~s requir?~B for n~'~w dwF~ll~ngs) the SMOke detectors <br /> <br /> i~q (~on~iderations requ~rr~ re,,)owl of the m~propriate <br /> m~')~{ K(-,::'Ling coverings to fa~iliate concealed interconnected <br /> wiring. (316.1.1) <br />12. SMOKE DETECTORS ~EQUIRED~ SMoke detectors shell be installed <br /> in each. ~slee'*~'ing ~'OOM. ~ outside. .. . of. each~ separa+'e sleeping <br /> area ~n ,he ~MMe(t~ate wc~n).ty of the bedrooms. <br /> All detectors shall be interconnected such that the <br /> actuation of on~ mlarm~ will actuate all the alarms in the <br /> individual unit and shall provide an alarm which will be <br /> audible ~n all sleeping ~reas. <br /> Ail detectors shall be approved and listed and shall be <br /> installed in accordance w~th the Manufacturer's instructions <br /> (316.1) <br />13. ~NCHOR BOLTS. The sill plate or foundation system shall be <br /> anchored to the foundation with 1/2-inch-diaMeter bolts <br /> placed 6 feet on center 7 inches into concrete not More than <br /> 12 inches from corners or ends with not less than two bolts <br /> per plate. Bolts shall extend a MiniMuM of 7 inches into <br /> Concrete. Bi}l plates shall be protected aqainst decay <br /> where required by Section 322. (483.~ & Figure <br />t4. WALL BRACING. The ,,~iniMuM 48-inch braced wall panel width <br /> required by Table 682.~ May be replaced by an alternate <br /> braced wall panel. See attached detail. <br /> Ali vertical joints of panel sheathing shall occur over <br /> studs. Horizontal joints shall occur over blocking of <br /> sufficien~ thickness to macoMModate the required nailing <br /> except where waived bx the. installatio)l requirements for the <br /> specific sheathing Ma~eria~s. (682.~ Exception) <br />15. HEADERS. Headers are r~guired at al~ openings in the <br /> exterior walls shown on ~he p]aos, due to t~e roof syste~ <br /> the three new exterior walls are load bearing and the plans <br /> do not ~pecify headers at any of the oper)ings. <br /> The new window gozng into the existing bedroom requires a <br /> header. <br /> The following openings require heade)'s: <br /> 1. 6'- ~" by 6~- 8" new bedroom sliding door. <br /> ~ 3'-8"b~ ~'- 8" ne~ bathroom window. <br /> 4. 5'- B" by 4'- 8" existing bedroom new window. <br /> MJ~lliM(IM header size 4x6, based on 6 foot span & DF' ~2. <br />~6. ROOF TRUSSES are required, to he designed by an Oregon <br /> registered Engineer .or Architect. For trusses Manufactured <br /> by an.a~prowd fabrication plant, have the design mnd <br /> layout orawings available a~ the construction site for the <br /> framing inspeEtion. Ail job site cutting or Modification <br /> of the roof trusses shall be clearly sh~n in the <br /> engineer's design calculations ~nd drawinqs. If trusses <br /> are to be built' mt the job site~ submit t~e engineer's <br /> design ~nd construction plans to ~h~ Marion County Buildi~lg <br /> [)ep~rtMe)¥~ pre:or to start of (::o)~sl-~'u(:iion and have the <br /> ~pproved dr~wi)igs ava~l~bi~ at the site for the framing <br /> inspection. <br />17. ENERGY PATH. P~*th ~1 is h~sed on R-21 ~all insL~].ation~ R-25 <br /> ~tnderfloor i)'mui~t~or~. R-J8 w~u!ted ceiling insulation.~ R- <br /> i{8 flat ceiling L~)sul~t:i.o)~)~ R-21 h~seP, ent walls~ R-15 slab <br /> <br /> <br />