Laserfiche WebLink
MARION COUNTY BUILDING INSPECTION <br />COMMUNITY DEVELOPMENT CENTER <br /> <br /> ~IB Ohuroh Stifle NE · Room 11~ · 8llem, Oregon <br />Offloe Hour~: 8:00.4:~0 · Phone: (801) M8-~147 · ~4-HR Inepeotlon Line: (~08) 8~-44~? <br /> <br /> BUILDIN~ PF..RNIT <br />DATE/TINE : S5/~/96 14:21 PERHIT NO : 96-g2665 <br />TYPE : Residential accessory struct STATUS : ISSUED <br />CLASS <br /> Residential garage/carport ISSUED ~5/~3/1996 <br />CONSTRt~TTOH = V-H <br /> piece. Figure (R-~) <br /> 17. Th~ dwe]]Jng p]an use~ Brace Wa]]. Panels (BP) to meet the <br /> code requirement for Iateral walt bracing. Insure that all <br /> BP's are located as indicated on the plans. <br /> t3. This plan uses a PORTAL FRAME to meet the lateral <br /> wall bracing requirements of the code. Insure that all <br /> detailed construction requirements shown on the plans and <br /> on the attached PORTAL FRAME DETAIL sheets are followed. <br /> NOTE E~PEC[ALLY THE REQU[REMENT~ FOR REBAR EXTENDING BACK lB <br /> FEFT. <br /> t4. Provide screened attic vents with a net free area of <br /> of the att~.r area (or 1/3B~ if half is along eaves and the <br /> other hail in the upper portion). (R-7~7) <br /> ]5. Roof trusses are required to be designed by an Oregon <br /> registered Engineer or Architect. For trusses manufactured <br /> by-an approvea fabrication p]ant~ have the design and <br /> layout drawings available a~ the construction szte for the <br /> framing ~.nspection. All job site cutting or ~odification <br /> of the roof trusses shall he ctearl~ shown in the <br /> engineer's design calculations and drawings. If trusses <br /> are to be built at the job site, submit t~e engineer's <br /> design and construction plans to the Marion County Buildi~g <br /> Department prior to start of construction and have the <br /> gpproved drawings available at the site for the framing <br /> znspection. <br /> ]6. ~APPROVED FOR PRIVATE NON COMMFRCIAL USF ONLY JF <br /> <br /> <br />