Laserfiche WebLink
7. The applicants should contact the Mt. Angel Fire District to obtain a copy of the District’s Recommended <br />Building Access and Premise Identification regulations and the Marion County Fire Code Applications Guide. <br />Fire District access standards may be more restrictive than County standards. <br /> <br />8. The applicants should contact Marion County Land Development and Engineering (503-584-7714) for additional <br />Engineering Requirements and Advisories, listed in Finding #6 below, that may be required. <br /> <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision <br />to a Marion County hearings officer. The applicant may also request reconsideration (one time only and a $200.00 fee) on <br />the basis of new information subject to signing an extension of the 150-day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form <br />available from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, <br />Salem by 5:00 p.m. on March 13th, 2026. If you have questions about this decision contact the Planning Division at (503) <br />588-5038 or at the office. This decision is effective March 14th, 2026, unless appealed. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />1. The subject property is designated Primary Agriculture in the Marion County Comprehensive Plan and zoned <br />EFU (Exclusive Farm Use). <br /> <br />2. The subject property is located 1,650 feet west of the intersection of Dominic Rd and Meridian Rd on the south <br />side of the Dominic Rd right-of-way. The property is currently vacant and is made up of the path of an <br />intermittent stream named Bochsler Creek and commercial farm fields. The parcel is considered legal for land use <br />purposes. <br /> <br />3. Surrounding uses are exclusively comprised of commercial farm operations and are entirely zoned EFU. <br /> <br />4. Soil Survey of Marion County Oregon indicates 100% of the subject property is composed of high-value farm <br />soils. <br /> <br />5. The applicants are proposing to establish a primary farm dwelling on the vacant 59.43-acre parcel. <br /> <br />6. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> Requirements: <br />A. At the time of application for building permits, an Access Permit may be required to document <br />access off the private easement Butsch Lane extending from Meridian Road. <br />B. Transportation System Development Charges (TSDCs) and Parks fee will be assessed at the time <br />of application for building permits. <br />C. Any new utility service extensions such as electric power originating from within the public right- <br />of-way to the property require permits from MCPW Engineering. <br /> <br /> Marion County Septic commented: “Soils and site evaluation will be required to approve a parcel for an onsite <br />septic system. Can not drive over drainfield. <br /> <br /> <br />All other contacted agencies either failed to comment or stated no objection to the proposal. <br /> <br />7. Primary farm dwellings in an EFU zone can be permitted through the options provided in MCC 17.136.030(A). <br />The options depend on whether the dwelling will be located on high-value farmland, or if it will be built in