Laserfiche WebLink
6. The applicants should contact Marion County Land Development and Engineering (503-584-7714) for additional <br />Engineering Requirements and Advisories, listed in Finding #6 below, that may be required <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regulations <br />the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision to a <br />Marion County hearings officer. The applicant may also request reconsideration (one time only and a $200.00 fee) on the <br />basis of new information subject to signing an extension of the 150-day time limit for review of zoning applications. <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form available <br />from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, Salem by 5:00 <br />p.m. on March 2nd, 2026. If you have questions about this decision, contact the Planning Division at (503) 588-5038 or at <br />the office. This decision is effective March 3rd, 2026, unless appealed. <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br />1. The subject tract is designated Primary Agriculture in the Marion County Comprehensive Plan and zoned Exclusive <br />Farm Use (EFU). <br />2. The subject parcel is located directly south of Rambler Dr NE, approximately 700 feet west of the intersection with <br />Howell Prairie Rd NE. The property contains one residence built in 1925 and a few accessory structures. The property <br />contains a berry farming operation and is predominately flat, with one wooded patch of land. <br />The parcel has been described in its current configuration since 1966 (Vol. 623 Pg. 229). The parcel is therefore legal <br />for land use purposes. <br />3. Surrounding properties consist of large parcels involved in farm operations with a few containing dwellings; all are <br />zoned EFU. <br />4. The applicants propose a secondary farm dwelling for family members who are principally engaged in operating the <br />farm. <br />5. According to Marion County Soil Survey, the subject tract consists of 99.8% high value soils. <br />6. Various agencies were contacted with request for comments: <br />Marion County Building Inspection commented: “No Building Inspection concerns. A manufactured home placement <br />permit would be required to be obtained, as well as separate utilities permits for those systems exceeding 30 ft from the <br />proposed manufactured home, such as electrical, water, sewer, or gas or propane utilities, prior to the placement or <br />installation of systems.” <br />Marion County Fire District #1 commented regarding the standard fire district requirements for new dwelling <br />construction. These can be found in full in the case file. <br /> <br />Marion County Septic commented: “Will require septic site and soils evaluation.” <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br />ENGINEERING REQUIREMENTS <br />A. An Access Permit will be required for the proposed residence. The area of the proposed driveway appears <br />over-grown with vegetation that will require clearing. An existing mapped 8-inch diameter drainage culvert at <br />that location will need to be replaced to meet the minimum standard of 12-inch diameter. Addition of gravel <br />and/or optional paving will also be necessary.