Laserfiche WebLink
APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regula- <br />tions the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision <br />to a Marion County hearings officer. The applicant may also request reconsideration (one time only and a $200.00 fee) <br />based on new information subject to signing an extension of the 150-day time limit for review of zoning applications. <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form <br />available from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, <br />Salem by 5:00 p.m. on January 5th, 2025. If you have questions about this decision, contact the Planning Division at <br />(503) 588-5038 or at the office. This decision is effective on January 6th, 2025, unless appealed. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />l. The SA (special agriculture) zone is applied in areas characterized by small farm operations or areas with a <br />mixture of good and poor farm soils where the existing land use pattern is a mixture of large and small farm units <br />and some acreage homesites. This zone allows the flexibility in management needed to obtain maximum resource <br />production from these lands. It emphasizes farm use, but forest use is allowed and protected from conflicts. The <br />SA zone is also intended to allow other uses that are compatible with agricultural activities, to protect forests, <br />scenic resources and fish and wildlife habitat, and to maintain and improve the quality of air, water and land <br />resources of the county. <br /> <br />2. The property is located on the west side of Orville Road S, approximately 1 mile south of its intersection with <br />Vitae Springs Road South. The property contains a single family dwelling, accessory structures, well, and septic <br />system. Building Inspection Division records reveal that in February 1983 permits were issued to place the <br />dwelling on the property. It replaced a mobile home that was placed on the property, with permits, in 1979. In <br />2004 the property owners at the time applied for a conditional use medical hardship (CU04-024) and it was <br />approved by the Planning department. Based on the building permit history and past land use case, the property is <br />considered a lawful parcel for land use purposes. <br /> <br />3. All surrounding properties are zoned SA and consist of small acreages devoted residential uses mixed with larger, <br />generally wooded, parcels. <br /> <br />4. Soil Survey of Marion County Oregon indicates 98.9% of the subject property is high-value farm soils. <br /> <br />5. The applicant is proposing to adjust the guest house standards to allow a guest house inside of a building further <br />than 100 feet away from the primary dwelling. <br /> <br />6. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br /> Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> ENGINEERING REQUIREMENT <br /> <br />A. Transportation-related System Development Charges (SDCs) and Parks fee will be assessed at the <br />time of application for building permits for conversion of all or part of the existing personal use <br />storage structure to a guesthouse. <br /> <br />Marion County Septic Inspection commented: <br /> <br />Condition of Approval: An authorization is required to connect a proposed guesthouse into the existing <br />septic system. <br /> <br />Marion County Building Inspection commented: <br />Permit(s) are required to be obtained prior to alterations to the existing structure and/or utilities installation. The <br />existing structure may be required by the state building code to be structurally assessed by an Oregon licensed