Laserfiche WebLink
2. The property is located on the southwest side of the intersection between Butteville Rd NE and Broadacres Rd <br />NE, in between the Butteville Rd right-of-way and a railroad right-of-way. The property is currently vacant and <br />planted with grass. The parcel has been in its current configuration since at least August 29th, 1907, when it was <br />created and sold in a bargain and sale deed (Vol 99 Page 58) to the Oregon Electric Railway Company. This <br />predates the adoption of partitioning and subdivision ordinances in Marion County, so therefore the parcel is legal <br />for land use purposes. <br /> <br />3. Surrounding uses include a wide variety of different uses atypical for predominantly EFU zoned areas. To the east <br />on the other side of Butteville Rd is the old Broadacres Store and an EFU zoned parcel with 9 dwelling sites <br />established prior to the adoption of modern land use ordinances. Additionally, there are a number of smaller (10- <br />acres or less) parcels with varying levels of connection to farm uses continuing along both sides of Broadacres <br />Rd. To the west (on the south side of Broadacres Rd) the parcel is immediately bordered by the Uspenska Church <br />followed by several farm field parcels with no structures. To the northwest is the site of the old Broadacres <br />subdivision which contains several small non-farm parcels with dwellings. Further in this direction are a number <br />of small (10-acres or less) farmstead parcels—some with dwellings, others with just agricultural structures—all <br />the way until Case Rd NE. Immediately to the north are several smaller parcels, again some with dwellings, and <br />most not involved with commercial agriculture. However, 850 feet north along the railroad right-of-way is the <br />beginning of the Marion Ag Service Inc development, which includes one I (Industrial) zoned parcel and several <br />EFU zoned parcels with approvals for commercial uses in conjunction with agriculture (CU14-022 & CU15-039). <br />Finally, to the south are a few small acreage homesite parcels quickly followed by a number of large farm field <br />parcels with no developed structures. Other notable uses and features in the area include an established <br />commercial solar generation site and an approved (but not established) site for a commercial seed cleaning plan <br />roughly 0.5-miles north and 0.33-miles east along Butteville Rd. <br /> <br />4. Soil Survey of Marion County Oregon indicates 100% of the subject property is composed of high-value farm soils. <br /> <br />5. The applicant is proposing to establish an excavation business as a commercial use in conjunction with agriculture. <br /> <br />6. Various agencies were contacted about the proposal and given an opportunity to comment: <br /> <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> Engineering Requirements: <br /> <br />A. An Access Permit will be required at the time of application for building permits. A maximum of one (1) <br />full-time driveway approach to the property will be allowed. It will be required to either permanently <br />close the existing Butteville Rd access, or at the Applicant’s option, to gate it as a limited use secondary <br />entrance/exit in the event vehicular traffic is queued-up in front of the proposed Broadacres Rd main access <br />during a train crossing. A Broadacres access approach would need to be placed betwee n a distance <br />increment of 100’ to 132’ as measured from the Butteville Rd centerline to satisfy MCRTSP access spacing <br />policy, while also avoiding a regulatory trigger regarding access work in proximity to a RR grade crossing. <br />Pursuant to OAR 741-120-0020 (8) pertaining to Grade Crossing Construction and Maintenance in <br />proximity to a Railroad, "The construction of new driveways within 100 feet of any railroad track at <br />existing grade crossings requires an application under ORS 824.206, except for railroad right-of-way <br />roads." Effectively then, the Broadacres Rd access should be situated more or less opposite the center of <br />the RR crossing pavement legend. <br /> <br />B. Utility service extensions within the public right-of-way require permitting through PW Engineering. <br /> <br />C. Stormwater detention may be required at 0.5 acres or more of development. <br /> <br />D. Transportation System Development Charges (SDC’s) will be assessed at the time of application for <br />building permits and are generally based upon building square footage and use category. <br />