Laserfiche WebLink
10. The applicants should contact Marion County Land Development and Engineering (503-584-7714) for additional <br />Engineering Requirements and Advisories, listed in Finding 5 below, that may be required. <br /> <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regulations <br />the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision to a <br />Marion County hearings officer. The applicant may also request reconsideration (one time only and a $200.00 fee) on the <br />basis of new information subject to signing an extension of the 150 day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form available <br />from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, Salem by 5:00 <br />p.m. on December 8th, 2025. If you have questions about this decision contact the Planning Division at (503) 588-5038 or <br />at the office. This decision is effective on December 9th, 2025, unless appealed. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />1. The subject property is designated Forest in the Marion County Comprehensive Plan and zoned TC (Timber <br />Conservation). The purpose of the TC zone is to conserve forest lands by maintaining the forest land base and to <br />protect the forest economy by making possible economically efficient forest practices that assure the continuous <br />growing and harvesting of forest tree species as the leading use of forest land consistent with sound management <br />of soil, air, water, and fish and wildlife resources and to provide for recreational opportunities and agriculture. <br /> <br />2. The subject property is located on the north side of Highway 22, roughly 1.33 miles east following the path of the <br />highway from the intersection of Niagara Heights Rd SE and Highway 22. The subject parcel was partially impacted <br />by the 2020 Beachie Creek wildfire and several old structures were destroyed. However, some of the structures <br />survived the disaster. This includes a 1995 assessed dwelling and one accessory structure west of the house that <br />was at one time referred to as a cabin. Prior to the fire, the parcel contained several other structures, including an <br />old gas station building, café, and several old cabin structures. Research into the history of the parcel, including old <br />site plans, previous permits, and a conditional use for a medical hardship CU87-089 found that there was only one <br />legal dwelling on the parcel at the time of the fire. There were several accessory structures identified as “old cabins” <br />and “old house” on the site plans, but none of these were assessed as dwellings going back to at least the 1980’s. <br />Further, in the reconsideration of CU87-089, Finding #8 states that the reconsideration was approved on the basis <br />that any unoccupied dwellings on the parcel were to be rendered unlivable and that there is “only one permanent <br />dwelling on the property”. The medical hardship dwelling remained on the parcel until it was reconfigured into its <br />current configuration, leaving the 1995 dwelling as the only dwelling structure on the property. The parcel was most <br />recently the subject of a partition and property line adjustment case P/PLA15-012, which created the parcel in its <br />current configuration. Therefore, the parcel is considered legal for land use purposes. <br /> <br />3. Surrounding properties include parcels primarily dedicated to forest habitat preservation. The subject parcel is <br />surrounded by a property owned by the Confederated Tribes of the Warm Springs Reservation that was also created <br />by P/PLA15-012 for the purpose of creating wildlife habitat and open space. The only other neighboring property <br />owner is the State of Oregon, which owns several timber parcels and an old railroad right-of-way on the south side <br />of Highway 22. Of additional note, the parcel is roughly 1.33 miles northwest as the crow flies from Big Cliff Dam. <br /> <br />4. The applicant is proposing to replace two structures that were destroyed by the 2020 Beachie Creek wildfire that <br />were previously a gas station and a café. <br /> <br />5. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br />Engineering Requirements: <br /> <br />A. Transportation System Development Charges (TSDCs) may be assessed upon application for building <br />permits. Please note that a limited duration waiver on those assessments for properties impacted by the <br />September 2020 Beachie Creek Fire is currently in place until the end of calendar year 2025. <br />B. Utility service extension replacement / restoration from within the public R/W requires permitting <br />through MCPW Eng. <br />