Laserfiche WebLink
DATE/TTi'IE: <br />TYPE <br />CLASS <br />I:H~CUPANCY <br />r~IqSTRI~TTDH <br /> <br />MARION COUNTY BUILDING INSPECTION <br /> COMMUNll~ DEVELOPMENT CENTER <br /> <br /> 285 Chumh StreetNE · Room 132,~lem, Oregon97301-3670 <br /> Office Houm:8:00-4:30,~L(/~)~ll~o 2~HRInspection Une:(503)588-7904 <br /> = ~/~8/96 ~6:33 PERHIT NO : 96-~27 <br /> ~e~ S~.ngl~ F~ly D~e~li~g. STATUS :ISSUED <br /> : ~-ra~Jy u~e~ng~ aetacnea ISSUED = B1/~8/1996 <br /> : R-3 TO EXPIRE = ~7/&6/1996 <br /> = V-H PAGE 3 <br /> inches. The ~tni~,.m net ~pentng height shall be 24 inches. <br /> The ~iniP~un net clear' opening aFea shall be at least <br /> square feet.. <br />1~.. The ~arage shall be comp]ete]~ separated from the residence <br /> and zts attic area by means of 1/2-inch nypsum board or' <br /> equivalent applied to the garage side. The door between <br /> the garage and residence shall be equipped with solid wood <br /> door~ not less than 1 ~/8 inches in thickness or' 20-minute <br /> fire rated, or equivalent. (R-~09.2) <br />~.?. In seismic zone ~, water heaters shall be anchored or <br /> strapped to r'~sist hor'izontal d~splacePlent due to <br /> earthquake mosion. (P-~.3~0 (e) <br />~3. Appliances that generate a ~l?w, ~p~rk or 'flame capable of <br /> igniTin, g gasoJine.: vapors ann locase~. . .... in a garage shall be <br /> iDstal~ed w~th b~r~ers,.b?neT }gnit[~n devices or heatzng <br /> eJe~enTs ann swi:cnes a: J. easT ~ inCheS above the floor ' <br /> level <br />14. Smoke detectors sha].l be installed outside of each separate <br /> sleepi~q ~e~ in ~he.i~med~a~? v~ciD~t¥ of the bedroo,s and <br /> on eacn-aaoi~ionaJ ssory OT She awe~ling including <br /> basements. ~11 detectors shall be interconnected such that <br /> the actuation of one alarm mill actuate all the alarms in <br /> the individual unit and shall provide an alarm which will <br /> be audible in all sleeping areas. (R-215.1) <br />tS. This dwelling plgns_uses.a, comb~nat~on of Brace Wall Panels <br /> (BP) and A].ternaTe uraceo wall raneis (ABP) to Flee[ the <br /> code requirements for lateral mall bracing. Insure that <br /> a]~] ~P's and ABP's are located as indicated on the plans <br /> and constructed as shown. <br />~4. Roof trusses are requ~r'ed to be designed by an Oregon <br /> registered Enqineer or Architect. For t~-usses manufactured <br /> by'an approve~ fabrication plant, have the design and <br /> layout drawings available at the construction site for the <br /> trapping inspection. All ~ob site cutt'ing or modification <br /> of the roof trusses shall be clearlg shown in the <br /> engineer s design calculations and ~raming~. If trusses <br /> are to.be built at the ~ob site, submit the engineer's <br /> design and construction plans to the Harion County Building <br /> Oeparte~ent prior to start of construction and have the <br /> approved drawings available at the site for the framing <br /> inspection. <br />~7. Energy Path $1 is based on R-2]. wall insulation, R-.25 <br /> underfloor insulation,-R-;Se vat, lied ceiling insulation, R- <br /> ~8 flat ceiling insulation, R-21 basement walls, R-15 slab <br /> floor edge insulation, R-8 forced air duct insulation~ 0.40 <br /> [I-w]tLe w~.ndom class, 0.50 U-value skylight class, 0.~4 U- <br /> value main entry.do~' with a e~aximum of 24 square feet and <br /> 0.70 U-value doors, other than the main entdy · <br /> (including the door between the heated dwelling and the <br /> unheated garage). <br /> <br /> <br />