My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1305249
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
94-XXXXX
>
Permit - 1305249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2011 8:55:32 AM
Creation date
9/5/2003 8:25:46 AM
Metadata
Fields
Template:
Permits
Permit Address
225 PATTON RD
Permit City
Detroit
Permit Number
94-01805
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARION COUNTY BUILDING INSPECTION <br />COMMUNr~Y DEVELOPMENT CENTER <br /> <br /> 28s Church Street N~ o R~em 132. Salem, Oregon 97301-367O <br />Office Hours: 8:00-4:30 · Phone:i(503) r~8-5147 - 24-HR Inspection Line: (503) 588-7904 <br /> <br /> SEPtiC PERMIT <br />BATE/TTME : 12/26/95 15~$4 pERMIT MO : 75-18~72 <br /> STATUS = iSSUED <br />TYPE : 8P ISSU£D = 12/26/1995 <br />OCCUPAHCY : R-3 : TO EXPIRE : 12/2~/1996 <br /> ] PAGE 2 <br /> <br /> SEPTIC :P~.RMIT <br /> <br />';'h~s property was previously evalated :08/00,/~ for. ~he feasibility to ins.t,~ll <br />approval was ~ra~ted. The approval i~ sz~e mP~Fific ~ the area ~es~eo~ end the sel)~ic <br />s,yst~ Mu.st,be located in ~he i~ediate area elm the test' pits, unless otherwise author-[z~+~) <br />,bo this off;ce, A new m~te ~valuation ~y be :r~quired if the syste~ i~ proposed for <br />d'~'f~re~t area on ~he proper~y. <br />,Th~m-approval wa~ qiven o~ ~he basis tha~ the'~lDt or parcel ~1I not be furthe~ <br />or *subdivided an~ ~hat cond~tionS o~ this property and on adjacent p[operties are ~ot altered <br />~t a~y ~anner ,hich would p~ohibit the lSS~anqe', o? ~ peceit~ .B~ils.in ~e <br />shatt,,.~ot,be altered by cu~ting~ filling, or o~her qeve~o~aen:ai ac:ivt~ies <br />impede ~he successful operation of the, initial: ~r reBlaceMe~t absorption systelqs. ~ai'.Lt~re <br />to..-c~)p, ly wifh the above items May void ~h~s ~prove~. <br />The si~e evaluation approval runs ~ith the ie di, bu 'the ,permi~ is ~on-tra~sferable and non <br /> % m <br />re? ~his docu~m~t ~h your 'records. LSho,w.~h'~_Ber~i~ ~o the septic <br />~nstallat~ol~ of the sTmte)~. Any devta~ton lr~J~ ~ne approved plaY) ~ust hove <br />th~s office. , <br /> / <br /> <br />sep~tc ,~ysteM= <br /> TYPE'OF INITIAL SYSTEM:. STAN~A~B <br /> MINIMUM SEPTIC TANK CAPACITY=I~ G~ <br /> LINEAL FEET OF 9RAINFtELD: 1~0 ' <br /> TYPE OF DISTRIBUTiON:'SERIAL". <br /> <br /> OI~PQSAL TRENCH,~EPTH:, 24 INC~E <br /> TOTAL DRAIN MEBIA. ~EPTH:i12 INCHE <br /> ORAIN ME~IA UNDER.PiPE:: 6 INC~E <br /> MINIMUM SOIL BACKFILL: 12 IRENE <br />~ROtJHD WATER INTERCEPTOR:' N " <br /> <br />apply to the installa'~ion of the [n:[tial <br /> <br />MINIHUfl~24 INCHE$~ MAXIMUM <br /> <br /> The d~sposal ~renches are co~structed tw~ <br /> and with no line exceeding 1~ feet in <br /> installed level (+/- one inch) and <br /> <br />TYPE [IF FUTURE REPLACEMENT SYSTEM~ <br /> <br /> !(2) feet wide and on MiniMun ten (10) foot ce)'rt.'er <br /> gth. The trenches and perforated pip(, are <br /> bd tO folio, the natural ground surface, " <br /> <br /> STANOA~! <br /> :1 <br /> <br /> COMMenTS AN~ OOND~T~QN8 <br /> <br />TNI$ S~PY~O R~¥I~W WA~ COMPLETEP ~Y LEE ~RIME~ SN ~E~EMBER 1 <br />4. 1B~S, INSTALL TNE BRAIRFIELD~.~S PE~ R~VISEQ SITE PLAN <br />DATED JUNE 7~ 19~4. A PRE-OSNSTRUOTION P~£L~ 8TAK£OUT ~8 <br />R~COMMENDEB TO CONFIRM TWELOCAT~N8 AN~ ELEVATIONS OF THE <br />INBIVIDUAL BRAINFIELB LINES. ANEFFLUENT PUMP ~ NECESSARY <br />TO. INSTALL ~NE ~A~NL~N~S WITHIN ~H£ APPROVED AREA AT THE <br />CORRECT DEPTN. 8B~ERVE ALL ~S~AL SETBACK ARS SEPARATION DIS- <br />TANCES.'NOTE. ESPECIALLY THE 2~ 'F~ET MINIMUM'SETBACK FROM <br />THE STORM ~RAIN CATOH BASIN AN~ RPA~ ~ITCN. ~SE CARE NOT TO <br />ALTER THE NATURAL TOPSB~L W~TH:[N ~H~ ~RAINFIELD SITES PRIOR <br />TO INSTALLATION. ~RY SOIL ~ONSTRIi~I'~N I$ R~QUIREQ TO AVOI~ <br />E×CERSIVE SOIL, COMPAOTII)N QIJR~NG ~N.~AI,,.LAT~ON~ <br />l'h~s symteM wuSt be inspected prior lo rover To r'equoqt <br />an i,spectio~ of co~Iet~d wgr~, Hall 588-79~4 (~4-hour- <br />l~oP), W'e~ 'eq~st~ag ~e ~spe~'t'i~ be sure ~o give <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.