Laserfiche WebLink
M rion County <br /> <br /> OREGON <br />COMMUNITY D~VELOPM ENT <br />DE PARTMI~'NT <br /> <br />NOTICE OF ~PROFAL= <br /> <br />EVALUATION REPORT FOR AN <br />ON-~ITE SEWAGE DISPOSAL SYSTEM <br /> <br />December 6, 1994 <br /> <br />JO~N GROSS <br />3475 BIEGLER L~tN~ SOUTH <br />SALEM, O~GON 97302 <br /> <br /> SUBJECT~ SITE #94-4133, <br /> SITE ADDRESS~ <br /> <br /> T:10S, R:SE, S:02AD, T/L~270g <br />205 LA~0~ST DRIVE, DETROIT, OP~GON 97342 <br /> <br /> our effice has completed the evaluatics for the proposed installation of <br />an on-site sewage System. The septic syste~ is proposed to serve a two <br />bedroom residence ca the property. <br /> <br /> Eased on the results of this study, on-site sewage disposal ap~ars <br />feasible for the property- Approval is for the installation of a STANDARD <br />SEWAGE DISPOSAL SYSTEM, as described in the attache4 COnStruction d~tail and <br />setback sheets. <br /> <br /> This approval is given on the basis that the 10t or parcel will not be <br />further partitioned or subdivided and that condition~ on this property and on <br />adjacent properties are not alte=ed in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area ~hall not be altered or <br />modified by cutting, filling, Or ether developmental activities which would <br />impede the successful operation of the initial or =epla~ent soil absorption <br />systems. Failure to comply with ~he above items may void this approval. <br /> <br /> This repo~ is..~p.t~ De,it to install thg..sewaq~ system. A permit ..~.ust <br />be obtained before any svstem construction occurs. A ps=mi= may be issued only <br />after the property has been J0und to be compatible with applicable LCDC <br />acknowledged local ¢0mpreheneive land use plan. A Statement of Land Use <br />compatibility or its equivalent is required before a construction permit can <br />be issued. <br /> <br /> A detailed plot plan, drawn to s0ale (ex. 1" = 60'), must be submitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer. <br /> <br /> This site evaluation repe~t ie valid until an on-site sewage system is <br />installed pursuant to the ¢onstructie~ ~mit obtained f~om this office, or <br />until earlier cancellation pursuant to the Environmental Q~ality Commission <br />~ules. Subject to the above, this report runs with the land and will <br />cally benefit subsequent 0Where. <br /> <br /> Our office hours ar~ Monday through Friday, $;00 tO 4:30. Please contact <br />our office if ton have any questions concerning this repo~t. <br /> <br />Marion C6fin%y ~uilding I~eeti0n <br />LEE A. GRIMES, SOIL SCIENTIST <br /> <br /> <br />