Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br /> DEPARTMI]NT <br /> <br />6e 1993 <br /> <br />A"l L E <br /> <br />JEFFREY CHASE <br />5320 NW ESTER ST~T <br />YARCOUV~R, WASHINGTON 98663 <br /> <br />SITE ~93-1155, T.iO$, R.SE, SECTION 2 <br />LOT 2, BLOCK 2, PATTON ADDITION <br />125 FIRST STREET, DETROKT, OREGON 97342 <br /> <br /> I have reviewed the plot plan a two bedroom residence.on <br /> the property described above. The proposal conflicts ~th <br /> ]~% the condltions set forth by the site evaluation letter <br /> ~dated october 13, 1992, so we cannot consider the <br /> cation as submitted. <br /> /~n~ two primary conflicts are: ~pe, tge house has been <br /> ~shlf~ed farther to the no~th ellminatln9 the necessary <br /> ~ept~o tank site and two, the proposed driveway from the <br />>~'~ south and resulting cut for the driveway and. parking <br /> ~apron will be too close to the replacement drainfleld. <br /> <br /> /As outlined by the si~e evaluation letter, We recommend a <br /> ~/ pre-cons~rucc~on s~te stakeout of all proposed develOp- <br /> ment prior to any excavation. Refer to the enclosed <br /> ~stakeout procedure for details to complete the stakeout. <br /> <br /> con,act our office with a revised to-Scale-dream plot <br /> plan of the actual stakeout, so we can visit the property <br /> to verify that there will be no conflicts. Call, if you <br /> have any questions. I am usually in the office between <br /> and 10 AM. <br /> <br /> GRIMES, SOZL gCZENTiST <br /> MARION COUNTY, BUILDING INSPECTIONS <br /> <br />Senator Buiidin§ 220 Hish SU'~St NE ~al~m, Ore~o~9~7301'3670 ~ <br /> <br /> <br />