My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1304585
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
94-XXXXX
>
Permit - 1304585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2011 2:05:20 PM
Creation date
9/4/2003 4:38:45 PM
Metadata
Fields
Template:
Permits
Permit Address
125 1ST ST W
Permit City
Detroit
Permit Number
94-03401
Permit Type
Permit
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br /> DEPARTMI]NT <br /> <br />6e 1993 <br /> <br />A"l L E <br /> <br />JEFFREY CHASE <br />5320 NW ESTER ST~T <br />YARCOUV~R, WASHINGTON 98663 <br /> <br />SITE ~93-1155, T.iO$, R.SE, SECTION 2 <br />LOT 2, BLOCK 2, PATTON ADDITION <br />125 FIRST STREET, DETROKT, OREGON 97342 <br /> <br /> I have reviewed the plot plan a two bedroom residence.on <br /> the property described above. The proposal conflicts ~th <br /> ]~% the condltions set forth by the site evaluation letter <br /> ~dated october 13, 1992, so we cannot consider the <br /> cation as submitted. <br /> /~n~ two primary conflicts are: ~pe, tge house has been <br /> ~shlf~ed farther to the no~th ellminatln9 the necessary <br /> ~ept~o tank site and two, the proposed driveway from the <br />>~'~ south and resulting cut for the driveway and. parking <br /> ~apron will be too close to the replacement drainfleld. <br /> <br /> /As outlined by the si~e evaluation letter, We recommend a <br /> ~/ pre-cons~rucc~on s~te stakeout of all proposed develOp- <br /> ment prior to any excavation. Refer to the enclosed <br /> ~stakeout procedure for details to complete the stakeout. <br /> <br /> con,act our office with a revised to-Scale-dream plot <br /> plan of the actual stakeout, so we can visit the property <br /> to verify that there will be no conflicts. Call, if you <br /> have any questions. I am usually in the office between <br /> and 10 AM. <br /> <br /> GRIMES, SOZL gCZENTiST <br /> MARION COUNTY, BUILDING INSPECTIONS <br /> <br />Senator Buiidin§ 220 Hish SU'~St NE ~al~m, Ore~o~9~7301'3670 ~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.