Laserfiche WebLink
July lB, 1994 <br />APPLICANT: <br /> <br />PAY ~ILMARTIN C/O ACE SEPTIC SERVICE <br />94-2685 <br /> <br /> Your site has been found suitable for a STANDARD ON-SITE SEWAGE DISPOSAL <br />SYSTEM. The following constr~c~ion speoificati0ns shall apply to the installa- <br />tion o~ your septic sys~e~. <br /> <br /> 1. The septic tank shall have a minimum liquid capacity of 1900 <br /> gallons. <br /> <br /> The projected daily sewage flow for this project iS calculated at <br /> 450 ~allq~s oer_da¥. Based on soil conditions observed on this <br /> site, th~ disposal fiel~ will be sized et lS0 lineal feet per 150 <br /> Gallons of projected daily sewage .flow. A minimum of 450 lineal <br /> feet of disposal field will be required for yo~r ~roposed develop- <br /> ment. The disposal ~enohes are sonstructed two (2} feet wid~ and <br /> on minimum ~e~ (10) foot centers and with nO line exceeding 12S <br /> feet in length. The trenches and perforated pipe are installed <br /> level (~1") and contoured to follow %he natural ground sub,ace. <br /> <br />The disposal field s~all be constructed with ~¢ri~l distribut,,ion <br />with a minimum trench depth of 24 inches and a maximum trench <br />depth of ~4 inches. There must be at leae~ ~2 inc~s of ba~k~ill <br />over the top of the gravel~ n~asured fr~Y~ the natural ground <br /> <br /> This approval is site spesific to the area te~ted and the septic system <br />~ust be located in the in~ediate area of the test pits unless o~herwise autho- <br />rized by this office. A new site evaluatio~ may be requlrCd if the system is <br /> <br />SPECIAL OONDZTION$~ <br /> Construct the drainfi~lds On the upper part O~ the property. Avoid the <br /> westerly test pit and the southeasterly three pits where the soil is <br /> shallower to brittle clay and firm saprolite. A pre-construction field <br /> stakeout is recommended to establi~h the elevations and locations of th~ <br /> individual drainfield lines of both systems prior to any excavation and <br /> si~ing the w~ll. Refer tO ~he enclosed stakeout prosedure and the set- <br /> back list for details to complete the Stakeout. Soil conditions are <br /> marginal for standard System consideration. Use c~e not =o alter the <br /> natural topsoil prior =o constructien. AllOW space ~or a future upslope <br /> curtain drain shoul~ it prove necessary. An effluent pump might be <br /> re. ire4 to locate the drainfields within ~he a~roved area at th~ <br /> correct deDth. <br /> <br /> <br />