Laserfiche WebLink
[:~IR[CTOR <br /> <br /> ~,j~, <br /> <br />PLANNING <br />[NF'ORCEME NY <br /> <br />Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMi~NT <br />DEPARTMENT <br /> <br /> SITE EVALUATION APPROVAL <br /> <br /> An lnspectlOn ha8 been made and your property has <br /> been appf©ved for the installation of an on~site sewage <br /> disposal system. The results of that inspection and <br /> specifications for the sewage system are on the <br /> attached reports. The approved sewage disposal area <br /> includes area for the initial sewage system and full <br /> replacement area to be used iD the event of the fallure <br /> of the ~nltial system. <br /> Thls approval is g:v~n on the basis that the lot <br />or parcel w~ll not be further partitioned or subdivided <br />and that condlt&ons on this property and on adjacent <br />properties are not altered in any manner which would <br />prohlblt the issuance of a per,it. Soils in the <br />approved area shall not be altere~ or modified by <br />cutting, filling, or other developmental activities <br />wh%ch wo~ld impede the S~ccessful operation of the <br />initial or replacement soil absorption system~ Failure <br />to comply wlth the above items may void this approval. <br /> This report 1~ not a permit to install the sewage <br />system. A permit must be obtained before any system <br />construction occurs. A permit may be issued only after <br />the property has been found to be compatlble with <br />applicable LCDC acknowledged local comprehensive land <br />use plan. A Statement of Land Use Compatibility or ~ts <br />equivalent is required before a construction permit can <br />be issued. <br /> A detailed plot plan of the proposed system must <br />be submitted with the permit application before the <br />construction-tnstallatlon permit can be issued. The <br />system must be installed by the property owner or a DEQ <br />llcensed septic installer. <br /> This site evaluation report is valid until an on- <br />site sewage system is installed pursuant to the <br />construction permit obtained from this office, or until <br />earlier cancellation pursuant to the Environmental <br />Qs@lity Commission rules. Sub3ect to the above, this <br />report runs w&%h the land and will automatically <br />benefit subsequent owners. <br /> Our office hours are Monday through Friday, 8:00 <br />to 4:30. Please contact our office if you have any <br />questions concerning this report. <br /> <br />Rdbert Foster, Registered S~nitari~'~ <br /> <br />301-3670 <br /> <br /> <br />