Laserfiche WebLink
B. Product Data: Submit manufacturer current technical literature for each component. <br /> C. [LEED Submittal: <br /> 1. Product Data for Credit MR 4.1 [and Credit MR 4.2]: For products having recycled content, <br /> documentation indicating percentages by weight of postconsumerand pre-consumer recycled content. a <br /> Include statement indicating costs for each product having recycled content.] <br /> D. Samples for Initial Selection: For each type of asphalt shingle, [ridge and hip cap shingles] product indicated. <br /> 1. Include similar samples of exposed trim and accessories involving color selection. <br /> Specifier Note: Delete paragraph and subparagraph above if colors and other characteristics are preselected and <br /> specified or scheduled. Retain first paragraph and subparagraph below with or without above if products have been pre- <br /> selected. <br /> E. Samples for Verification: For the following products, of sizes indicated and to verify color selected: <br /> 1. Asphalt Shingle: Full-size asphalt shingle strip. <br /> 2. Ridge and Hip Cap Shingles: Full-size ridge and hip cap asphalt shingle. <br /> 3. Self-Adhering Under%ayment: 12-inches square. <br /> F. Maintenance Data: For asphalt shingles to include in maintenance manuals. <br /> G. Warranties: Sample of special warranties specified in this Section. <br /> H. Closeout Submittals: <br /> 1. Refer to Section[01 78 00 Closeout Submittals][insert Section number and title]. <br /> 1.4 QUALITY ASSURANCE <br /> A. Qualifications: <br /> 1. Installer shall have successful installation experience with installation of PABCO®Roofing Products <br /> under similar conditions. <br /> 2. Installation shall be in accordance with asphalt shingle manufacturer's installation guidelines and <br /> recommendations. tip <br /> B. Source Limitations: Provide ridge and hip cap shingles [felt underlayment] [and] [self-adhering sheet <br /> underlayment] through one source as recommended by the asphalt shingle manufacturer. <br /> C. Fire-Test Response Characteristics: <br /> 1. Exterior Fire Test Exposure: Class A; UL 790 and CAN/ULC S-107 for application and roof slopes <br /> indicated. Identify materials with appropriate markings of applicable testing and inspecting agency. <br /> D. Mock-up: <br /> 1. Install mock-up using approved asphalt shingle assembly including related accessories per <br /> manufacturer's current printed instructions and recommendations. <br /> a. Mock-up size: [10-feet by 10-feet1 [insert size]. <br /> b. Mock-up may [not] remain as part of the work. <br /> 2. Contact manufacturer's designated representative prior to asphalt shingle assembly installation, to <br /> perform required mock-up visual inspection and analysis as required for warranty. <br /> E. Pre-installation Meeting: <br /> 1. Refer to Section[01 31 00 Project Management and Coordination] [insert section number and title]. <br /> 2. Hold a pre-installation conference,prior to start of asphalt shingle installation at Project site to review all <br /> related project requirements and submittals, status of substrate work and preparation, areas of potential <br /> conflict and interface, availability of asphalt shingle assembly materials and components, installer's <br /> training requirements, equipment, facilities and scaffolding, and coordinate methods, procedures and <br /> sequencing requirements for full and proper installation, integration and protection. <br /> a. Attendees shalt include contractor,architect,installer, owner's representative, and asphalt <br /> shingle manufacturer's designated representative. <br /> 1.5 DELIVERY, STORAGE AND HANDLING <br /> A. Refer to Section [01 60 00 Product Requirements] [insert section number and title]. <br /> Project Name/Project Number/Insert Date Revised 11117120-Page 2 ASPHALT SHINGLES <br /> PABCO®Roofing Products <br />