Laserfiche WebLink
Project No. 20084.00 D,ct08/29/2022 <br /> ` SUBJECT: Design; <br /> Canopy Weight Take-Off JK <br /> Section: <br /> Cascade Jr High Seismic Rehabilitation Checked: Page: <br /> Iiiir <br /> Revised Canopy Weight Take-Off <br /> Canopy Materials: <br /> TPO Roofing 0.3psf <br /> '''A" Dens Deck 1.2psf <br /> 5/8" Plywood Sheathing 1.8psf <br /> Fire Rated Ceiling Assembly 12.0psf <br /> Misc. 0.5psf <br /> Total DL=15.8psf <br /> Design DL=16psf>Actual DL, OK <br />