My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1298852
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
Old Files 2
>
Permit - 1298852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 2:03:40 PM
Creation date
9/4/2003 2:23:28 PM
Metadata
Fields
Template:
Permits
Permit Address
20237 GRIM RD NE
Permit City
Aurora
Permit Type
Permit
Permit Site Number
2463
Permit Doc Type
Permit Document
Status
Ready to Film
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'iCTOR ATIYEH February 5, i~80 <br /> Governor <br /> <br />Mr. Rancid d. Tippets, Superintendent <br />~orth ~srlon School District ~o. <br />2OI97 Grim Rd. <br />Aurora, OR <br /> <br />This viii confirm the agreements made on Janaary ~0, 1980 to <br /> <br />~o~th ~srlon Elementary School. Curre~l~r-a stor~ draln bisects <br />the ~ralnfield and discharges sewege~lJ~-Plctly iht0 Seven-Up Creek. <br /> in Seven-Up <br /> <br />Dye plsced In the open dlstributlo~box vb$ obGerved <br /> <br />To 'stop the vlolatlon~ the agreed to be <br />by ~arch l, 1~80; <br /> <br />completed <br /> <br />The existing roof s~orm dre.ln will be ra;oved a <br />minimum of 50 feet d~lent of the disposal <br />fields. After removal, the trench viii be packed <br />with soil to ~ravent~J~urther drainage. <br /> / <br /> <br />Tho storm varec off the roof viii be rerouted by <br />tight line north to &rim Reed end then ~eSt along <br />Grim Road to ~even-Up Cr4ek. The tight line mull <br />avoid the disposal trenGhes. <br /> <br />A licensed septic installer viii uncover each distribution box. <br />At that point, Ted $~enson, Sanitarian with ~arloe County. (telephone <br />S&8~SI&7)vIII be ContaCted to Inspect the lystem end the reroutt~ <br />and removal of thc storm drain- He will assist the Installer to <br />determine If each line is receiving in equal volume of the sewage. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.